2007年一级建造师市政实务真题及答案(In 2007, a construction division of municipal practice Zhenti and answers).docVIP

2007年一级建造师市政实务真题及答案(In 2007, a construction division of municipal practice Zhenti and answers).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2007年一级建造师市政实务真题及答案(In 2007, a construction division of municipal practice Zhenti and answers)

2007年一级建造师市政实务真题及答案(In 2007, a construction division of municipal practice Zhenti and answers) 2007 exam First, individual choice questions A total of 20 questions, 1 points each. Each item options, only 1 of the most to do) 1., the urban road pavement structure is often composed of multi-level, of which the main load-bearing role is (C). A. top layer B., bottom layer, C. base, D. cushion 2. rigid retaining walls move under the action of external force to fill the earth, so that the soil behind the wall is extruded upwards, and the horizontal pressure acting on the wall is called (C). A. horizontal thrust; B.; active earth pressure; C.; passive earth pressure; D.; static earth pressure The waste temperature of 3.EVA and PE polymer modified asphalt mixture is (D). A.165, B.175, C.185, D.195 4. the method of determining the optimum asphalt content of recycled asphalt mixture is (A). A. Marshall test, B. penetration test, C. ductility test, D. boiling test method 5. during the period of cofferdam use, the normal water level of the river is +2.0m, and the highest water level (including wave height) is +3.0m, and the minimum elevation of the cofferdam shall be (C). A.+2.5m B.+3.0m C.+3.5m D.+4.0m 6. municipal public works, concrete mix design should go through four steps, in which the construction mix ratio design stage to mix ratio adjustment, and put forward the construction mix ratio is based on (A). A. measured the relation between the water content of sand and gravel, the strength of B. and the design strength C. construction conditions, variations and possible fluctuations of material quality, D. strength verification principle and density correction method In the construction of 7. post tensioned prestressed concrete, the grouting of the prestressing tendon should be carried out in time, and the following is wrong about the pore pressure grouting statement (B). A. when the temperature is higher than 35 in the daytime, the grouting should be done at night After 24

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档