20石膏板吊顶工程(20 gypsum board ceiling works).docVIP

20石膏板吊顶工程(20 gypsum board ceiling works).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
20石膏板吊顶工程(20 gypsum board ceiling works)

20石膏板吊顶工程(20 gypsum board ceiling works) I. construction preparation (I) operating conditions 1, in the ceiling to be within the scope of the electrical and mechanical installation has been completed, all kinds of pipelines have been tested pressure qualified, has concealed acceptance. 2. The position of lights, vents and various lighting outlets have been determined. 3, the ceiling panels should be completed before the wall, ground and wet operation projects. 4, take good roof construction operation platform shelf. 5, light steel skeleton ceiling in a large area before construction, should be made model, the ceiling camber, light trough, curtain box, ventilation and so on place construction treatment, after identification, and then a large area construction. (two) material preparation Light steel keel, hanging rod, fittings, expansion bolts, screws, rivets, gypsum board, gypsum powder, paper tape, and entry inspection quality certificate. (three) construction tools; Profile cutting machine, electric curve saw, electric drill, electric hammer drill, tapping screws, portable electric sandpaper machine. Two, quality requirements (1) dark keel ceiling works; Quality requirements in line with the building decoration engineering quality acceptance specification (GB50210-2001) requirements. Table 3-14 Item entry check allowed or allowed Main control item 1 elevation, dimension, camber and shape 6.2.2 2 finishes material, section 6.2.3 3 installation of boom, keel and facing material, clause 6.2.4 4 boom, keel material, spacing and connection mode, section 6.2.5 5 gypsum board joint, section 6.2.6 General item 1 prefabricated component support position and method 6.2.7 2 install control sign section 6.2.8 3 hoisting of prefabricated parts, clause 6.2.9 4 temporary fixing measures and position correction, clause 6.2.10 5 allowable deviation of MM project of gypsum board metal plate, plastic board, mineral wool board template grille Surface smoothness 3222 Seam straightness

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档