火力发电厂分散控制系统验收测试规程(Acceptance test regulations for distributed control systems in thermal power plants).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
火力发电厂分散控制系统验收测试规程(Acceptance test regulations for distributed control systems in thermal power plants)
火力发电厂分散控制系统验收测试规程(Acceptance test regulations for distributed control systems in thermal power plants)
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
China electric power ()
Acceptance test regulations for distributed control systems in thermal power plants
Acceptance test regulations for distributed control systems in thermal power plants
Code, for, acceptance, test, of, distributed, control, system, in, fossil,, fuel, power, plant
Front
word
In accordance with the notice of the State Council on the standardization of thermal power automation Standardization Commission of electric power industry from 01 [2003] [national economic and Trade Commission, electric power division (2002) No. 973), the regulations are organized. This Regulation shall be promulgated and implemented from XX XX on 200 X, in order to replace the 98 edition of the code for on line acceptance test of thermal power plant distributed control system. The appendix A of this regulation is normative appendix, appendix B is data sex appendix. This regulation is put forward and standardized by the technical committee of standardization of thermal automation in the national electric power industry. This regulation is responsible for drafting units: Huaneng International Power Limited by Share Ltd. The main drafters of this regulation: Zhang Linming, XX * *. This procedure is explained by the technical committee of standardization of thermal automation in power industry. Directory 1. range 2. normative references 3. terms and definitions and abbreviations 4. test conditions 6. performance test 5. function test 7. anti-interference ability test of 8. document acceptance 9. availability assessment appendix A (normative) appendix B (informative) Peoples Republic of China electric power industry standard of thermal power plant control system acceptance testing procedures for dispersion
Code, for, acceptanc
您可能关注的文档
- 集装箱疏浚方案.doc
- 雨水收集装置.doc
- 阿祥四轮电动车手册.doc
- 雪铁龙车载电路阅读方法.ppt
- 零件别名规定(新).doc
- 降水分析.ppt
- 阅读加热工程图.ppt
- 雷诺Koleigh骄傲的维修.doc
- 需求单位数 09001.doc
- 零件映射方法.ppt
- 漆黑的魅影金手指(The phantom of the dark gold finger).doc
- 火炬之光1.15合体版sp5说明[修正](Torch light 1.15 fit version SP5 instructions [amendment]).doc
- 火舞(Mai).doc
- 火车票各站点售票时间(Train ticket booking time of each site).doc
- 火车票预售时间调整2013(Train ticket pre-sale time adjustment 2013).doc
- 灰铁试验(Iron test).doc
- 灯具安装工程(Lamp installation engineering).doc
- 火车站售票时间(Railway station ticket time).doc
- 灵活运用语文教材(Flexible use of Chinese Textbooks).doc
- 灵星雨控制板说明书(LSN control board manual).doc
文档评论(0)