火力发电厂基本建设工程启动及竣工验收规程(Code for acceptance of start-up and completion of basic construction projects of thermal power plants).docVIP
- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
火力发电厂基本建设工程启动及竣工验收规程(Code for acceptance of start-up and completion of basic construction projects of thermal power plants)
火力发电厂基本建设工程启动及竣工验收规程(Code for acceptance of start-up and completion of basic construction projects of thermal power plants)
Notice of the Ministry of power industry on Issuing the procedures for the commissioning and completion acceptance of the basic construction projects of thermal power plants
In order to meet the increasing demand of large thermal power units and automation,
Strengthening acceptance and acceptance of thermal power construction projects,
enter
Step by step improve the quality of thermal power projects, give full play to the effectiveness of investment, according to the State Planning Commission issued the construction project (project) completed
Measures for acceptance
I will
One thousand nine hundred and eighty
The regulations on acceptance and acceptance of the basic construction project for thermal power plants issued in 2004, revised to firepower
Code for acceptance of construction and completion of capital construction projects of power plants
It is hereby issued to you, please implement it in accordance with the actual situation, and
Will be in the implementation of the issues and opinions of the Ministry of construction and coordination department.
Basic construction project of thermal power plant
Specification for starting and final acceptance
One
General provisions
1.0.1
The basic construction of the thermal power plant is before the commissioning of each unit,
Must start the acceptance in time,
In this issue, the whole project
After the completion of the Department, must be completed in time for acceptance.
Start acceptance is a comprehensive inspection of production units and the corresponding construction and installation engineering design,
Equipment,
Construction,
Commissioning quality and production
The important part of preparation is to ensure that the unit will be safe, economical, fast, reliable, integrated and civilized in production and production
Productivity,
Key procedures for achieving investment effectiveness.
Unit with
您可能关注的文档
- 零件映射方法.ppt
- 静压桩质量保证措施.doc
- 非淬火钢筋曲轴的开发与应用.doc
- 非淬火和回火钢生产高强度管材.doc
- 韩国自主创新案例研究.doc
- 青藏线一线的士兵.ppt
- 降低燃油锅炉的燃油消耗.doc
- 静态平衡.ppt
- 防空气和汽车形状 -.ppt
- 项目2汽油发动机.ppt
- 数据仓库:Redshift:Redshift与BI工具集成.docx
- 数据仓库:Redshift:数据仓库原理与设计.docx
- 数据仓库:Snowflake:数据仓库成本控制与Snowflake定价策略.docx
- 大数据基础:大数据概述:大数据处理框架MapReduce.docx
- 实时计算:GoogleDataflow服务架构解析.docx
- 分布式存储系统:HDFS与MapReduce集成教程.docx
- 实时计算:Azure Stream Analytics:数据流窗口与聚合操作.docx
- 实时计算:Kafka Streams:Kafka Streams架构与原理.docx
- 实时计算:Kafka Streams:Kafka Streams连接器开发与使用.docx
- 数据仓库:BigQuery:BigQuery数据分区与索引优化.docx
文档评论(0)