- 1、本文档共26页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电梯运行的特性c(Characteristicsofelevatoroperationc)
电梯运行的特性 c++(Characteristics of elevator operation c++)
Within the ladder outside the first priority, in order to operate the minimum distance to respond to the request of the passengers outside the ladder
Consider the characteristics of several elevator operations:
1. states: stationary wait, uplink, downlink,
2. during the uplink, the instructions are divided into four cases: the current position has two instructions, the up and down instructions, and the up and down instructions at the current position
3. downlink process, the same 3. uplink description of the four cases
4. up and down, received a number of instructions, priority setting method (priority can also be the nearest principle, can also be the same direction priority, can also press the right way of calculating the priority level of the same direction: the power of 0.7 or more, the current level is the right distance from the target direction / final level, instructions wait longer more. According to all these results to determine the multiplication level to the next.
5., when the static state receives more than one user instruction, the priority choice method is set (can be close to the first meet, or the same 4 priority selection algorithm)
6. according to the cycle per week, record the number of times per day on each level up and down, count the activation level of each layer and the possible degree of uplink and downlink, which can be chosen as the algorithm to select the instruction priority
7. according to the data obtained from 6, it is possible to determine which layer the elevator should stop at rest and optimize the response time of each layer of the command
8., you can add the function that you can set the change priority method. You can adjust the algorithm according to the changing situation in order to expect the best priority selection algorithm
The simulation is easy to run. However, when the number of elevators is greater than a moment, if the algorithm is not good, it will appear:
1, e
您可能关注的文档
- 高中经济评估.ppt
- 骑着仪式 3.ppt
- 高一引擎.doc
- 高压充油电缆施工技术.doc
- 高压加油机的管理和维护.doc
- 高压油泵拆卸.doc
- 高压引起的套管损伤分析.doc
- 高压注水包装机简介.doc
- 高压开关测试.ppt
- 高压站手册.doc
- 四川省乐山市2024届高三三调数学文科含答案.pdf
- 天津市十二区重点学校2024届高三毕业班二模语文含答案解析.pdf
- 四川省凉山州2024届高三第三次诊断性检测数学(文)试题含答案.pdf
- 四川省大数据精准教学联盟2021级(2024届)高三年级第二次统一监测(大数据二统)文科数学答案.pdf
- 重庆市第八中学2024届高考适应性月考卷(七)化学答案.pdf
- 云南省昆明市2023-2024学年高三三模数学试题含答案解析.docx
- 南京市商品房买卖契约模板通用合集.docx
- 个人施工安全生产协议书合集.docx
- 二线城市乡下土地承包协议书合集.docx
- 一室一厅规格二手房买卖合同合集.docx
文档评论(0)