施工组织设计讲座(Lectures on construction organization design).docVIP

  • 2
  • 0
  • 约1.66万字
  • 约 15页
  • 2017-07-29 发布于河南
  • 举报

施工组织设计讲座(Lectures on construction organization design).doc

施工组织设计讲座(Lectures on construction organization design)

施工组织设计讲座(Lectures on construction organization design) This article is contributed by hyzn2007 Ppt documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Construction organization design Small space forum Construction organization design (program, technical disclosure) construction organization design (program, technical disclosure) basic requirements Key requirements: clear level, rigorous content, comprehensive, instructive, targeted, operational, serious, consistent with the norm Common problem The concept is not clear, the level is unclear, vague content lack of guidance targeted operational scheme, Disclosure Violation of norms scheme, a copy, disclosure form, after compensation is not complete, incomplete content is not fine without preparation, without approval or approval is not serious Compiling content First, according to the establishment of two, general situation three, construction deployment four, construction preparation five, the main project construction methods and quality assurance measures six, the main construction management measures I. basis for compilation 1, construction contract 2, construction drawings 3, the main atlas 4, the main specifications, procedures, standards 5, the main regulations 6, and others Construction drawing The name of general layout drawings Jianshi total 12004 - S01 - 11 edition 23# 1/6~ 6/6 22# 1/8~ build built built 8/8 24# 1/6~ 6/6 25#; 1/6~ 6/6 built 23# 1/19~ junction 19/19 junction 22# 1/9~ junction 9/9; 24# 1/17~ junction 17/17 25# 1/13~ junction 13/13 23# 1/4~ 4/4 22# 1/6~ 6/6; 24# /4~ 4/4 25# 1 1/5~ 5/5 23# 1/7~ 7/7 electric power equipment 22# electric power facilities 1/8~ 8/8; 24# 1/6~ 6/6 25# 1/9~ electric power electric power 9/9 map to figure out date 2004, 42004, 32004, 22004, 32004, 22004, 32004, 22004, 32004, 2 Major regulations, procedures, specifications, major regulations, procedures, specifications and s

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档