施工组织试题(Construction organization examination questions).docVIP

  • 1
  • 0
  • 约3.12万字
  • 约 35页
  • 2017-07-29 发布于河南
  • 举报

施工组织试题(Construction organization examination questions).doc

施工组织试题(Construction organization examination questions)

施工组织试题(Construction organization examination questions) Highway construction organization and budget examination questions Fill in the blanks 1., the sources of investment in Chinas highway construction projects include local investment, bank loans, and other sources of funding Answer: the state invests in foreign funds 2. the basic operation methods of highway engineering projects are sequential operation method and. Answer: parallel work method, flow method Two methods 3. quota table number: ___________________ and ___________________. Answer: [table - column - column] [chapter - table - column] 4. ___________________ only as a budget basis, not as a construction enterprise on the basis of ___________________. Answer: labor costs, real wages 5. any process started, must have ___________________ and ___________________ two construction elements. Answer: work face productivity 6. the main forms of the construction schedule are: vertical drawing and. Answer: Gantt chart, network diagram 7. the drawing method of double code network diagram is forward method, law and method. Answer: back method first rough after fine method 8.. The earliest time parameters in the code network diagram include: the earliest possible completion time and. Answer: the earliest possible time of the node to work, the earliest possible start time of the job 9., according to the role of valuation basis, the quota can be divided into and. Answer: project quota, cost quota 10. the budget for the highway project shall be composed of equipment, tools, equipment and furniture, construction expenses, other expenses and four major parts. Answer: Construction and installation costs, preparatory fees 11. the content of highway construction, according to the division of tasks and can be divided into __________________________, __________________________, __________________________, three aspects. Answer: highway engineering basic construction of highway engineering overhaul, repair and reconstruction of

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档