[摘要】本文介绍了三峡右岸水轮机主要参数选择的原则和主要参数的选择方法,电站运行表明,参数选
择先进合理,可以满足电站安全稳定运行的要求,对巨型混流式水轮机参数选择有一定的指导意义。
[关键词]参数选择:巨型混流式水轮机 ·
[中图分类号]TK730.2[文献标识码]B [文章编号]1000-3983(2009)02-0037-06
BankPower
The ofTurbineMainParametersSelectionforThree Station
Researching
您可能关注的文档
- 一起串联补偿电容器复杂故障的分析 Analysis on a Complicated Fault of Series Capacitor Compensation Equipment.pdf
- 一起交流滤波器不平衡保护跳闸事故分析 Analysis on an Accident of the AC Filter Trip Due to Unbalance Protection.pdf
- 一起电容式电压互感器绝缘在线监测案例分析 Analysis of an On-line Monitoring Insulation Case of Capacitor Voltage Transformer.pdf
- 一起风电场箱式变故障的保护动作分析.pdf
- 三元件串联LLC谐振变流器的优化设计策略 Optimal Design Strategy for Three Components Series LLC Resonant Converter.pdf
- 三列螺旋式绕组的换位 Transposition of Three-Row Helical Winding.pdf
- 三压再热蒸汽系统的热力参数优化分析 Optimization on Thermodynamic Parameters of Three-pressure Reheat Steam-Water Systems.pdf
- 三峡700MW水轮发电机组调速器液压系统的运行经验 Observation on Governor Operation of 700MW Unit in Three Gorges Hydropower Plant.pdf
- 三峡发电机定转子绝缘的国产化研究 Study on National-made Insulation Materials for Sanxia Stator and Rotor Windings.pdf
- 三峡右岸15~18号发电机振动及噪声优化改进 Improvement and Optimization for Vibration and Noise Performance of No.15~18 Power Generating Unit of Three Gorges Right Bank Power Plant.pdf
- 三峡右岸电站840MVA全空冷水轮发电机技术 Technology of 840MVA Fully Air-cooled Hydrogenerators for Three Gorges Right Bank Power Station.pdf
- 三峡巨型转轮加工新技术 New Machining Technology of Huge Hydro Turbine Runner.pdf
- 三峡永久船闸地下输水廊道二期混凝土施工技术 Construction Techniques of the Second-Phase Concrete for Three Gorges Permanent Navigation Lock Underground Water Galleries.pdf
- 三峡电站水轮机转轮制造工艺技术研究 Study of Manufacturing Technology of Hydaulic Turbine Runner for Three Gorges Project.pdf
- 三峡集团公司十二五通信规划综述 Review of the Twelfth Five-Year Telecommunication Plan of China Three Gorges Corporation.pdf
- 三明地区农网光纤通信网的建设及探讨 Discussion on construction of optical fiber communication network in Sanming rural electric power grid.pdf
- 三次谐波电压注入的五相感应电机SVM-DTC方法 Five-phase induction motor SVM-DTC strategies with third harmonic voltage injection.pdf
- 三次谐波注入式五相永磁同步电机气隙磁势分析 Air-gap MMF analysis for five-phase PMSM with third harmonic injection.pdf
- 三段式门极驱动抑制MOSFET关断过冲振荡的研究 Three-stage type gate voltage drive circuit to reduce turn-off voltage overshoot and ring in MOSFET.pdf
- 三电平Boost变换器软开关技术的研究 Research on Three Level Boost Converter Soft-switching Technology.pdf
原创力文档

文档评论(0)