网站大量收购闲置独家精品文档,联系QQ:2885784924

2、4号馆大会主承建商(Master contractor of assembly No. 2 and 4).doc

2、4号馆大会主承建商(Master contractor of assembly No. 2 and 4).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2、4号馆大会主承建商(Master contractor of assembly No. 2 and 4) Main contractors of the 1, 2 and 4 Libraries - Shenzhen Exhibition Center Management Co., Ltd. Engineering Group First, the operation process of exhibition booth: (a) the special booth exhibition process: 1, special booth review - deadline: before May 1, 2012, the following information will be submitted to the home contractor for review. Design the stereoscopic color effect chart, floor plan, elevation (including detailed size and material description), structural drawing and relevant power data, and Email to the main contractor. (do not accept faxes) For map mail: HYPERLINK, mailto:hsy@, hsy@, Tel: 07552, exhibitors or contractors to enter the reporting process required to the contractor to provide the following materials: Provide the contract (copy); booth confirmation (the company issued by the fair, report shall provide a copy); booth fee payment certificate; pay the deposit of the exhibitors are required to pay the bank deposit receipt. 3. After examining and approving the above materials, the organizer shall issue the Exhibitor registration form and Exhibitor registration form (evidence collection) 4, builders or exhibitors with exhibitors report (project) to the venue, on-site services, home contractors window for special booth admission procedures. At the same time, the following materials should be provided to the home contractor: A photocopy of the business license; that exhibitors and construction qualification; fill in the special booth construction safety responsibility (to be stamped with official seal and signature of exhibitors, the responsibility of two copies); the construction unit of the legal representative and the person in charge of construction certificates and copies of ID cards and phone number and other information. 5, exhibitors with exhibitors report form (evidence collection), to the museum on-site service, evidence window, to receive exhibitors documents. (two) the standa

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档