网站大量收购独家精品文档,联系QQ:2885784924

09年施工员考试题目(09 year construction worker examination topic).doc

09年施工员考试题目(09 year construction worker examination topic).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
09年施工员考试题目(09 year construction worker examination topic) Download now 2009 builders examination questions (volume) Instructions: 1, the examination time is 90 minutes; 2, the total score of 100 points; 3, closed examination. |, RadioButtonList (each of 1 points, a total of 50 points) 1, the construction of slurry retaining wall bored pile, the role of the protective cylinder is (a). The A. guiding function B. increases the head C., and protects the orifice D.A, B, and C 2, economic distance (d) for bulldozer. A.100m B.50m C.70~100m D.30~60m 3, the role of steel cold drawn is (C). A. increases the yield point B. and increases the steel C. in order to produce the prestressing D. for straightening 4, mass concrete pouring temperature difference between inside and outside shall not be greater than (D). A.5.C B.10. C C.15. C D.20. C 5, in order to ensure the concrete can be pumped, concrete per cubic meter of cement is no less than (). A.280kg B.300kg C.350kg D.500kg 6. The amount of water that fills the soil to achieve maximum density is called (a). A. optimum moisture content B, maximum moisture content C, water content D, minimum moisture content 7, the general light well point precipitation depth is (B). A.5m B.6m C.8m D.12m 8. Flash butt welding is applicable to the diameter of the steel bar from 1 to 2 (B). A.2~10mm, B.10~40mm, C.20~40mcm, D.40mm or more 9, keep straight Cha when brick masonry tie bar along the wall spacing shall not be greater than (). A.300mm B.500mm C.1000mm D.1500mm 10 、 in cast-in-situ concrete structure, the main requirement of formwork and supporting system is (D). A. guarantee the section size and position correctly, B. sufficient stiffness and stability C. enough strength, D.A., B, C are all 11, the demolition time of cast-in-place structural formwork depends on (D). A. structure, properties, B. templates, C., concrete hardening speed, D., A., B, C are all 12, prestressed concrete can be compared with ordinary concrete. A. reduces deforma

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档