循环流化床锅炉的综合技术对策初步探讨 (1)(Preliminary discussion on comprehensive technical countermeasures of circulating fluidized bed boiler (1)).doc

循环流化床锅炉的综合技术对策初步探讨 (1)(Preliminary discussion on comprehensive technical countermeasures of circulating fluidized bed boiler (1)).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
循环流化床锅炉的综合技术对策初步探讨 (1)(Preliminary discussion on comprehensive technical countermeasures of circulating fluidized bed boiler (1)) Circulating fluidized bed boiler comprehensive technical countermeasures preliminary discussion (1).Txt life is used to operate, rather than used to care about. Love is used to hold, not to test. Love is for love, not for hurt. Money is for enjoyment, not for measure. Lies are used to break, not to decorate. Trust is for precipitation, not for challenge. Preliminary discussion on comprehensive technical countermeasures of circulating fluidized bed boiler (1) 2007-03-22 12:53:22 Cheng Changye dynamic information network: 185 times the size of text: [] [] [] to enter the big small forum Core tip: there are many technical problems of circulating fluidized bed boiler, one of the important reasons is that the coordination and cooperation between the various links and circulating fluidized bed power plant project department is not enough, easy to appear many problems in this process, some key technical problems are discussed and put forward some solutions and experience, for professional reference. Key words: circulating fluidized bed boiler, comprehensive technical countermeasures, preliminary discussion, CFB boiler, comprehensive technical countermeasures, ignition start, operation adjustment, preliminary discussion 0 Preface CFB technology in circulating fluidized bed boiler has some technical problems in equipment manufacturing, engineering design and operation adjustment, and needs to be studied and analyzed so as to solve the concrete problems of accumulation. These puzzles have been related to manufacturing, design, debugging, supervision and operation, and so on. This article aims to play a role in attracting peoples attention, for the industry reference. 1 Technical Countermeasures for manufacturing and equipment modification Design of 1.1 drum The fire point of hybrid wind (i.e. mainstream wind) and the relationship between design and

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档