- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
某办公大楼冬季施工方案(Construction plan of an office building in winter)
This article is contributed by gangdan125
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Winter construction plan
A general situation of the project, * * * the office building a total construction area of 7446m2, is six story frame structure, the basement parking lot for C25 reinforced concrete floor, ramp for C35 reinforced concrete retaining wall, foundation concrete for underground C25, column C35, 1 ~ three structure beam and slab concrete for C30, column C35, structure more than four layers of beam plate C25, column C30. The basement floor cushion is C15, and the basement surface layer is C25. The actual starting date of the office building is * * * * * * * * *, and the contract shall be completed and delivered by X * * * * * * * * *. After * * * month of winter, the actual construction time of * * * month, shortened by more than 30% than the fixed period, to complete the construction must be completed on schedule five layer structure plane and 17.85 meters of the independent column this year, and the basement of the ground surface layer. It is necessary to take winter construction, in order to create conditions for the completion of schedule, winter construction starting date, according to the local climate conditions, generally from November 1st to March 15th second. The temperature is -25~10 degrees centigrade, and the temperature difference between morning and evening is large. The starting and ending dates can be determined by real measurements, and also by consultation between the two sides. Two, the concrete features of winter and the method adopted 1, winter concrete features: setting time: 0 DEG ~4 DEG, 15 DEG C 3 times longer, than the temperature drop to 0.3~0.5 degrees, the concrete began to freeze, the reaction stops, -10 C, hydration reaction completely stopped, concrete strength is
您可能关注的文档
- 昂立春季 倍角和半角正弦、余弦正切1 学生.doc
- 操作系统B卷和答案(1).doc
- 插值法和数据拟合.doc
- 撤县设区一道复杂算术题.doc
- 成都市凤凰新城规划与建设情况简介.doc
- 成功人不是赢在起点.doc
- 成功销售人员十大特质.doc
- 成立农村专业合作社必须满足条件.doc
- 成员间关系教案.doc
- 成衣缝制和车间管理.doc
- 某部赴玉树抗震救灾期间高原初步习服情况调查[1](Investigation on preliminary acclimatization of a unit during the earthquake relief in Yushu [1]).doc
- 某公司工资制度方案(Salary system of a company).doc
- 某建筑电气设计(Electrical design of a building).doc
- 摩托罗拉人才培养变革之道(Motorola talent training change road).doc
- 某建筑公司方案(A construction company program).doc
- 某酒店筹备计划书(Preparation plan for a hotel).doc
- 某县治理非法超限超载车辆工作总结(A summary of the work of governance illegal overloading of vehicles).doc
- 某医疗网站外链推广发布平台整理(Promotion of a medical website outside the chain publishing platform).doc
- 某住宅楼工程冬季施工方案(Construction plan of a residential building in winter).doc
- 某办公楼消防水系统的设计与调试(The design and debugging of the fire water system of an office building).doc
最近下载
- 教你怎样写英文简历 课件 英文版.ppt VIP
- 平安产险首批次新材料质量保证保险(中央型,示范条款2025版)条款.pdf VIP
- 一种液位变送器锁线结构.pdf VIP
- 钢筋石笼护脚单元关键工程质量评定表.doc VIP
- 人教版五年级数学上册《密铺》PPT课件.ppt VIP
- TSGR004-2023年固定式压力容器安全技术监察规程.docx
- 电子软件开发岗位招聘笔试题(某大型国企)2025年试题集详解.docx VIP
- 高中政治课后教学反思PPT.pptx VIP
- 隧道工程施工监理实施细则.doc VIP
- GB 50341-2014 立式圆筒形钢制焊接油罐设计规范及条文说明(带详细书签).docx
原创力文档


文档评论(0)