- 1
- 0
- 约9.47千字
- 约 13页
- 2017-08-04 发布于河南
- 举报
煤矿机电基础知识(Basic knowledge of coal mine mechanical and electrical)
Coal mine power supply, because of its special place of work, special requirements for power supply
Strict. In terms of power supply requirements:
Reliability of power supply;
Safety of power supply;
Quality of power supply;
The power supply is economical and reasonable.
Therefore, it is worthwhile to choose the power supply scheme and equipment reasonably
Topics explored.
Power supply design of 1 working face
The power supply system of a working face is usually made up of high voltage switch and pressure transformer
The utility model is composed of a low voltage feeding switch, a power cable, an electric equipment, etc.
Figure 1 (taking an ordinary fully mechanized coal face as an example).
Fig. 1 power supply system diagram of common fully mechanized face
1.1 selection and setting of high voltage switch
The high voltage switch mainly protects the two phases on the low voltage side of the power transformer
Short circuit, so the key to select high voltage switch is the current transformer capacity
The sensitivity coefficient Km1.5. Protection of high voltage switch
Can be complete, with good explosion-proof performance, to facilitate transportation, cut off
Large capacity. BGP- type 6 high voltage vacuum switch is used in mine. this
Switch protection performance is complete, with over-current, leakage, short-circuit, phase failure,
Loss of voltage protection, wide application, in order to switch for setting
Count.
1.1.1 short-circuit current setting
Short circuit current setting multiple: 1, 2, 3, 4, 5, 6, 8, 10,
12, 14, 16, 11 files.
1.1.2 overload protection setting
Overload protection setting multiple: 0.4, 0.5, 0.6, 0.7, 0.8,
1, 1.2, 1.4, 1.6, 1.8, 2, 11 files.
1.1.3 leakage protection setting
Leakage protection setting: 0.015 A to 1 A.
1.1.4 overload setting
Iz= (1.2 ~ 1.4) * Sigma Ie/ (Ki * Kb).
Type: Iz - overload setting current, A;
Ki - current transformer converter ratio;
Kb - transformer vol
您可能关注的文档
- 完工产品成本分配(Cost allocation of finished product).doc
- 完美解决ARP内网攻击+完美限速+ROS小包转发性能差的问题(Perfect solution ARP network attack + perfect speed limit, +ROS packet forwarding performance is poor).doc
- 完美世界仙丹配方(Perfect world elixir formula).doc
- 完工验收2(Completion acceptance 2).doc
- 完全解读Web 2_0(完全解读Web 2_0).doc
- 完全卸载Apple(完全卸载苹果).doc
- 完善干部平时考核办法- 中国日报网(Measures for improving cadres' assessment at ordinary times - China Daily).doc
- 完善企业内部会计控制的对策(Countermeasures for perfecting internal accounting control of enterprises).doc
- 完形填空常用动词(Cloze Test verbs).doc
- 完型常用词汇(Common vocabulary).doc
最近下载
- 音体美教学常规要求.doc VIP
- (2025)新课标《义务教育数学课程标准(2022年版)》测试题(附含答案) .pdf VIP
- 质量工程师中级培训教程.doc VIP
- 高中英语(北师大版)必修3—单词表.pdf VIP
- Unit 1 Time to Relax (第1课时) Section A 1a- 2d 课件 2026年春人教版英语八年级下册.pptx VIP
- QE质量工程师培训完整版教材.ppt VIP
- 杜曼教育——如何教宝宝学数学.pdf VIP
- 香港小学中文修辞手法练习.pdf VIP
- 2025-2026学年初中数学八年级上册(2024)沪教版(五四制)(2024)教学设计合集.docx
- GNSS接收机抗干扰技术研究.pptx VIP
原创力文档

文档评论(0)