浅谈电力变压器常见故障及诊断技术(Discussion on common fault and diagnosis technology of power transformer).docVIP
- 2
- 0
- 约1.1万字
- 约 9页
- 2017-08-03 发布于河南
- 举报
浅谈电力变压器常见故障及诊断技术(Discussion on common fault and diagnosis technology of power transformer)
1 Introduction
In the transmission and distribution of power transformer is the core of energy conversion and transmission, is the only way which must be passed the national economy and the energy source is the power of thousands of households, the most important and most critical equipment. The safe operation of power equipment is the first defense system to avoid the major accident of power grid, and the power transformer is the most critical equipment in this defense system. The serious accident of transformer will not only cause damage to itself, but also interrupt power supply, and cause enormous economic loss to society.
2 common faults and their diagnostic measures
2.1 transformer oil seepage
Transformer oil leakage will not only give the electric power enterprise bring greater economic losses, environmental pollution, will also affect the safe operation of the transformer, may cause damage to the emergency shutdown even unnecessary transformer, power to bring customers production losses and the inconvenience of life. Therefore, it is necessary to solve the problem of leakage of transformer oil.
Oil tank weld penetration. Oil can be directly welded to the joints at the seams, and the leakage of the oil at the joints of the corners and stiffeners is often not found. Or after welding, the leakage is repeated because of the internal stress. For this point of infiltration can be added with iron welding, at the junction of two sides, can be cut into spindle shaped iron welding joint surface; three according to the actual position of iron welding cut into triangles; it also applies to the two box corner weld lead bushing current transformer leakage welding.
High pressure bushing rises seat or enters manhole flange to seep oil. These parts are mainly due to improper installation of rubber pad, and can be applied to flange sealing during operation. The flange gap between good p
您可能关注的文档
- 新初春手杆野钓鲫鱼 - 春季钓鱼技巧(A new spring spring wild fishing for carp fishing techniques).doc
- 新春对联(Spring couplet).doc
- 新大纲180首必背作品诗人风格简介(New outline, 180 works, poet Style Introduction).doc
- 新大话2养育经济版神结局攻略(New big 2 parenting economic version of God Raiders).doc
- 新的补充内容(New additions).doc
- 新的计划书(New plan).doc
- 新都县八阵图记(明)杨慎(Xindu eight array seal (Ming) Yang Shen).doc
- 新读《孙子兵法》 黄朴民(A new reading of art of war, Huang Pumin).doc
- 新房体检 装修污染比想象可怕(New home physical examination, decoration, pollution than imagined terrible).doc
- 新耳机为什么要褒及煲的方法(Why should the new headset method praise and hot pot ).doc
- 广东省广州省实验中学教育集团2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州大学附属中学2025-2026学年八年级上学期奥班期中物理试题(解析版).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(含答案).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(解析版).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 2026《中国人寿上海分公司营销员培训体系优化研究》18000字.docx
- 《生物探究性实验教学》中小学教师资格模拟试题.docx
最近下载
- 职业学校学分制实施细则.docx
- AP微观经济学 2010年真题 附答案和评分标准 AP Microeconomics 2010 Real Exam with Answers and Scoring Guidelines.pdf VIP
- T_BIAS 14-2025 预制混凝土构件生产与运输标准.docx VIP
- T_ZAEPI 051-2025 再生有色金属工厂低碳运行评价指标体系.docx VIP
- 部编版五年级语文下册第一单元整体作业设计.docx
- 中国养老产业发展研究报告_1.doc VIP
- 2026年养老产业行业创新报告.docx
- C正谱怜悯我吧上帝 pieta signore.pdf VIP
- 《专业工程管理与实务》.pdf VIP
- 中国血栓性疾病防治指南(2025版).docx VIP
原创力文档

文档评论(0)