- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
绿化防护措施(Greening protection measures)
[route: 0]
1, -1, 100th to 700 chapter list, true,
100, 1, listing 100th, general provisions, false,
2, -1, has been included in the list of the total special provisional sum total, true,
3, -1, the list total minus special temporary amount, true,
4, -1, daywork together, false,
5, 4, labor, false,
6, 4, material, false,
7, 4, mechanical, false,
8, -1, unforeseen expenses (provisional amount), true,
9, -1, bid price, true,
[bridge: 0]
1, -1, 100th to 700 chapter list, true,
100, 1, listing 100th, general provisions, false,
2, -1, has been included in the list of the total special provisional sum total, true,
3, -1, the list total minus special temporary amount, true,
4, -1, daywork together, false,
5, 4, labor, false,
6, 4, material, false,
7, 4, mechanical, false,
8, -1, unforeseen expenses (provisional amount), true,
9, -1, bid price, true,
[route: 1]
1, -1, the first part of the construction and installation costs, highway kilometers, TRUE
100,1,,, FALSE
2, -1, second part equipment and tools, equipment purchase fee, highway kilometers, TRUE
3, -1, the third part of engineering construction, other expenses, highway kilometers, TRUE
4, -1, the first, second, third part of the total cost, highway kilometers, TRUE
7, -1, reserve fees, yuan, TRUE
5, -1, the total amount of the budget, yuan, TRUE
6, -1, highway basic cost, highway kilometers, TRUE
[bridge: 1]
1, -1, the first part of the construction and installation costs, the bridge length meters, TRUE
100,1,,, FALSE
2, -1, second part equipment and tools, equipment purchase fee, bridge length meter, TRUE
3, -1, the third part of the project construction, other expenses, bridge length meters, TRUE
4, -1, and the first, second, third part of the total cost, bridge length, meters, TRUE
7, -1, reserve fees, yuan, TRUE
5, -1, the total amount of the budget, yuan, TRUE
6, -1, the basic cost of bridge, bridge length, meters, TRUE
[route: 2]
1, -1, the first part of the construction and
您可能关注的文档
- 爬虫技术(Crawler technology).doc
- 爬山的呼吸方法及作用(The breathing method and function of mountain climbing).doc
- 牌位书写(Writing tablets).doc
- 爬虫原理(Reptilian principle).doc
- 类比分类(Analogical classification).doc
- 类风湿性关节炎(Rheumatoid arthritis).doc
- 类风湿性关节炎治疗(Rheumatoid arthritis treatment).doc
- 离岸账户(Offshore account).doc
- 离合器的正常使用(Normal use of clutch).doc
- 离合器的作用(Clutch action).doc
- 中国国家标准 GB/T 15445.3-2025粒度分析结果的表述 第3部分:试验曲线的参考模型拟合.pdf
- 《GB/T 15445.3-2025粒度分析结果的表述 第3部分:试验曲线的参考模型拟合》.pdf
- 中国国家标准 GB/Z 41305.3-2025环境条件 电子设备振动和冲击 第3部分:利用轨道车辆运输.pdf
- 《GB/Z 41305.3-2025环境条件 电子设备振动和冲击 第3部分:利用轨道车辆运输》.pdf
- GB/Z 41305.3-2025环境条件 电子设备振动和冲击 第3部分:利用轨道车辆运输.pdf
- 中国国家标准 GB/T 46713.4-2025轨道交通 机车车辆 辅助供电系统蓄电池 第4部分:镍氢蓄电池.pdf
- 《GB/T 46713.4-2025轨道交通 机车车辆 辅助供电系统蓄电池 第4部分:镍氢蓄电池》.pdf
- GB/T 46713.4-2025轨道交通 机车车辆 辅助供电系统蓄电池 第4部分:镍氢蓄电池.pdf
- 中国国家标准 GB/Z 106-2025质量管理体系 组织变革管理 过程.pdf
- GB/Z 106-2025质量管理体系 组织变革管理 过程.pdf
原创力文档


文档评论(0)