条基施工流程工艺(Construction process of strip foundation).docVIP

条基施工流程工艺(Construction process of strip foundation).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
条基施工流程工艺(Construction process of strip foundation) 1. The superstructure corresponding to the two basic types is different. The superstructure corresponding to the lower strip foundation of the wall is mostly the masonry structure, while the superstructure corresponding to the strip foundation of the column is the frame structure, the former is the bearing weight of the wall and the latter is the base bearing of the independent column. Two, the same is the bar form foundation, but the two forces state of the two is different, the former is the average wiring load, the latter is the point load, therefore its basic reinforcement is different. According to the drawing size Long * wide * height = volume m3 If there is a large drop foot, the construction process can be done according to the actual volume. Artificial cleaning tank level base to ground test tank, the water cushion - positioning of pay-off - ground beam reinforced - binding binding foundation slab reinforcement to hydropower embedded pipe fittings, shuttering to concealment acceptance, pouring concrete to build mode branch pipe rack to column reinforcement and concealment acceptance, pouring concrete to concealment acceptance, backfill soil - bricklaying - binding ring beam reinforcement and concealment acceptance to pouring concrete, backfill soil. Reply to peoples supplement 2009-09-30 14:39 The elastic foundation beam method is more complex and can be used with the method of inverted beam and shear balance. Reply to the supplementary 2009-09-30 14:41. Scope of application: The bar base of the column is usually used in the following situations: 1. The multi-storey and high-rise building basement or have a basement but no waterproof requirements, when the upper structure under load is bigger, the foundation bearing capacity is low, adopt various forms of independent foundation does not meet the design requirements. 2. When the base area of the sole base is not extended due to the constraints of adjacent bu

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档