门式钢架厂房结构安装技术(Structural installation technology of gantry steel frame).docVIP

门式钢架厂房结构安装技术(Structural installation technology of gantry steel frame).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
门式钢架厂房结构安装技术(Structural installation technology of gantry steel frame) Structural installation technology of gantry steel frame Date: 2010-11-30 9:50:16 edit: information center click: In recent years, due to the characteristics of steel structure and the improvement of steel production, the steel structure technology has developed rapidly. A large number of steel structure light steel plants have been built in China, especially in the portal frame structure. I have been engaged in steel structure installation work, the following is combined with my company is the construction of factory building, according to the structural characteristics of portal rigid frame workshop describe such a structure in the installation process and some problems should be paid attention to. Gantry frame components structure, light weight, thin, easy to deformation, and installation precision demand is high, so choose rational installation sequence is a key link to ensure the quality of whole structure installation and reasonable installation program is as follows: beginning with column brace between internode, install four pillar of between the steel column and its support, to form a stable body. Then install the roof beam and the secondary structure of the two columns, so as to form a stable installation unit, and then extend the installation, and install the steel column, crane beam, roof beam and other components in turn. The adjustment of the crane beam shall be carried out after all structural installation is completed. According to the structural features, it is divided into three zones for installation, the first area is the installation of DEF cross structure, the second area is the installation of FGH cross structure, and the third area is the installation of HJK cross structure. Installation order: the installation of each area are from 18 to 1 line installation, first installed between line and line 17 18 steel column and column brace I, roof structure, etc., after the adjust

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档