铁路工程施工技术总结(Summary of railway engineering construction technology) I. project overview: The starting range of the construction of the line is dk70 + 000, and the terminal length is dk72 + 600, including the long chain 310 meters, and the line is 2.91 square kilometers. There is a bridge in the pipe section: dk71 + 022.24-32m beam + 1-48m steel girder bridge, 192.9m; The central bridge of dk71 + 7091-32m liang sizhu Yin is a total length of 45.61 meters, dk72 + 028.363-24m girder malan river, with a total length of 84.61 meters, dk72 + 3902-20m beam + 2-12m beam, and the length of the bridge is