- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
黄石市未来几年交通规划(Huangshi city traffic planning for the next few years)
1. Highway construction
Construct the expressway network of three vertical and three horizontal rings. Further perfecting GuoShengDao highway network, new GuoShengDao trunk 388 kilometers, the total mileage of 949 kilometers, the comprehensive cover all organizational system of villages and towns, to form a high-density GuoShengDao high-grade highway network free of charge. The existing state road has basically reached the first level highway standard, the provincial highway has already reached the second level road standard, the pavement pavement reaches the advanced level; The highway optimization and integration of important county and rural areas is promoted as the national provincial highway, and the new adjustment of the provincial highway basically meets the above standards.
Attached: three vertical and three horizontal one ring high grade road network three vertical: to build a large and wide high-speed yellow stone segment, planning and construction of huangshi -- yangxin, ma cheng -- yangxin expressway;
Three horizontal: the existing shanghai-chongqing expressway and the Yangtze river bridge in edong, built the hangzhou high speed yellow stone section, and planned to build the yellow and salty (yellow stone checkers-xianning) high speed and the chessboard chessboard Yangtze river bridge;
A ring: yellow salty high-speed daye golden lake to board where the state, state highway bridge board, shanghai-chengdu kiln to scattering flowers section of the Yangtze river bridge, the east - big wide high-speed ezhou flower lake to daye golden section.
2. Construction of Hong Kong airlines
To give play to the status and role of huangshi as the main port of the country, and to revitalize the huangshi water transportation. We will focus on the construction of a new port area of chessboard state, complete the first and second phase of the project and form the production capacity, and become the leading por
您可能关注的文档
- 1 过滤风速问题 气布比(1. Filter wind speed problem gas cloth ratio).doc
- 1 氧气管道材质及管件的选用(1. Selection of oxygen pipe material and pipe fittings).doc
- 1.房产经纪人培训(二)0(1. Estate agent training (2) 0).doc
- 08和13定额对比(08 and 13 quota contrast).doc
- 1.恒温槽测试思考题答案2(1. The constant temperature tank test the answer 2).doc
- 09造价员理论试题及答案(Cost member theoretical test questions and answers).doc
- 10 操作界面与操作逻辑(Operation interface and operation logic).doc
- 10.1.1虚拟仿真施工技术(10.1.1 virtual simulation construction technology).doc
- 10-接驾科仪(10 - connect the driver).doc
- 09导游基础知识应用综合卷(一)(Guide to basic knowledge of guide (1)).doc
文档评论(0)