- 11
- 0
- 约3.01万字
- 约 25页
- 2017-08-04 发布于河南
- 举报
08和13定额对比(08 and 13 quota contrast)
Construction engineering valuation quota
Chapter I project A geotechnical engineering (description of changes in 2013)
First, artificial soil (stone)
1. Article 6: artificial excavation pile quota shall be applied to construction under the conditions of safety protection measures; (quota increase in 2013)
2. Article 8: manually excavate the hole pile and the vertical transportation in the pile shall be considered manually. If the depth exceeds 12m, the artificial dosage of 12m is multiplied by the coefficient 1.3 in 16m and multiplied by the coefficient 1.5.
您可能关注的文档
- 四年级数学下册 质数与合数教案 青岛版五年制.doc
- 四年级下册食品包装上信息课后反思.doc
- 四上习作五 XX自述.doc
- 四种期刊评价工具比较研究.doc
- 填料对塑料加工性能以和材料性能影响.doc
- 填料塔设计问题.doc
- 填料主要性能指标与类型.doc
- 同比和环比计算方法.doc
- 图画书阅读和儿童非智力发展.doc
- 图画移动复制与大小变化教学设计.doc
- 湖北《钢结构装配式住宅技术规程》.docx
- 2026-2027学年第一学期八年级上册数学月考9月学情监测卷含答案(华师).pdf
- 万利达(Malata) 618 广场舞音响售后维修服务手册.pdf
- 指北者 TK10 乐器音箱售后维修服务手册.pdf
- 音乐骑士 T3 G10s 音响售后维修服务手册.pdf
- 先锋(Pioneer) MK808 音箱售后维修服务手册.pdf
- 山水(SANSUI) PU215 广场舞音响售后维修服务手册.pdf
- 安桥(ONKYO) TX8470 功放售后维修服务手册.pdf
- 2026-2027学年第一学期八年级上册数学月考9月学情监测卷含答案(人教).pdf
- 意力(ELAC) DCB61 音箱售后维修服务手册.pdf
原创力文档

文档评论(0)