- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
08和13定额对比(08 and 13 quota contrast)
Construction engineering valuation quota
Chapter I project A geotechnical engineering (description of changes in 2013)
First, artificial soil (stone)
1. Article 6: artificial excavation pile quota shall be applied to construction under the conditions of safety protection measures; (quota increase in 2013)
2. Article 8: manually excavate the hole pile and the vertical transportation in the pile shall be considered manually. If the depth exceeds 12m, the artificial dosage of 12m is multiplied by the coefficient 1.3 in 16m and multiplied by the coefficient 1.5. In the same hole, the soil type is not at the same time, according to the fixed weighted calculation, if there is flow sand, flow mud, separate processing. (quotas increased in 2013)
2. Mechanical earthwork
1, article 4: mechanical excavation need artificial excavation slope (including finishing bottom edge, build by laying bricks or stones) of quantities, according to the approval of the construction organization design to determine the thickness of the calculation, no construction organization design of artificial digging thickness calculated at 15 c M, implement the corresponding quota project multiplied by the coefficient of 2; (quota increase in 2013)
2. Article 5: excavate the soil between the piles, the actual volume of the excavated volume (excluding the volume of the pile volume), the corresponding item multiplication factor is 1.50; (quota increase in 2013)
3. Article 10: loading and loading machine loading and loading capacity of loading machine multiply by coefficient of 1.50; (quota increase in 2013)
4. Article 11: mechanical transportation of silt and flow sand shall carry out the corresponding items of the mechanical transporting soil, multiplying by the coefficient of 1.50. (quota increase in 2013)
Chapter ii treatment of foundation B and slope support engineering (description of changes in 2013)
First, the foundation machinery changes fill the soil, soil, sand
您可能关注的文档
- 四年级数学下册 质数与合数教案 青岛版五年制.doc
- 四年级下册食品包装上信息课后反思.doc
- 四上习作五 XX自述.doc
- 四种期刊评价工具比较研究.doc
- 填料对塑料加工性能以和材料性能影响.doc
- 填料塔设计问题.doc
- 填料主要性能指标与类型.doc
- 同比和环比计算方法.doc
- 图画书阅读和儿童非智力发展.doc
- 图画移动复制与大小变化教学设计.doc
- 1.恒温槽测试思考题答案2(1. The constant temperature tank test the answer 2).doc
- 09造价员理论试题及答案(Cost member theoretical test questions and answers).doc
- 10 操作界面与操作逻辑(Operation interface and operation logic).doc
- 10.1.1虚拟仿真施工技术(10.1.1 virtual simulation construction technology).doc
- 10-接驾科仪(10 - connect the driver).doc
- 09导游基础知识应用综合卷(一)(Guide to basic knowledge of guide (1)).doc
- 1000个最简单常用的英语单词(The 1,000 most commonly used English words).doc
- 背包的选择(Backpack selection).doc
- 100-编号(Number 100 -).doc
- 背照式cmos 与ccd(Backlight cmos and CCD).doc
文档评论(0)