- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
08和13定额对比(08 and 13 quota contrast)
Construction engineering valuation quota
Chapter I project A geotechnical engineering (description of changes in 2013)
First, artificial soil (stone)
1. Article 6: artificial excavation pile quota shall be applied to construction under the conditions of safety protection measures; (quota increase in 2013)
2. Article 8: manually excavate the hole pile and the vertical transportation in the pile shall be considered manually. If the depth exceeds 12m, the artificial dosage of 12m is multiplied by the coefficient 1.3 in 16m and multiplied by the coefficient 1.5. In the same hole, the soil type is not at the same time, according to the fixed weighted calculation, if there is flow sand, flow mud, separate processing. (quotas increased in 2013)
2. Mechanical earthwork
1, article 4: mechanical excavation need artificial excavation slope (including finishing bottom edge, build by laying bricks or stones) of quantities, according to the approval of the construction organization design to determine the thickness of the calculation, no construction organization design of artificial digging thickness calculated at 15 c M, implement the corresponding quota project multiplied by the coefficient of 2; (quota increase in 2013)
2. Article 5: excavate the soil between the piles, the actual volume of the excavated volume (excluding the volume of the pile volume), the corresponding item multiplication factor is 1.50; (quota increase in 2013)
3. Article 10: loading and loading machine loading and loading capacity of loading machine multiply by coefficient of 1.50; (quota increase in 2013)
4. Article 11: mechanical transportation of silt and flow sand shall carry out the corresponding items of the mechanical transporting soil, multiplying by the coefficient of 1.50. (quota increase in 2013)
Chapter ii treatment of foundation B and slope support engineering (description of changes in 2013)
First, the foundation machinery changes fill the soil, soil, sand
您可能关注的文档
最近下载
- 零售金融消费者权益保护专题报告 2024.docx
- 传感器与检测技术第四版胡向东习题答案.pdf
- 2023全国职业院校技能大赛-西式烹饪赛项备考试题库-下(多选题部分) .docx
- 保时捷Cayenne Turbo, Turbo S_2010款_汽车使用手册用户操作图解驾驶车主车辆说明书电子版.pdf
- 动物疫病防治员国家标准.doc VIP
- 爱戴尊敬荣光 麦克白 威尔第钢琴伴奏五线谱子.pdf VIP
- 新时代、新思维、新高考.pptx
- 2002年至2019年 西藏自治区15岁及以上文盲人口(人口抽样调查)统计.docx
- 医院应急预案及处理流程.docx
- 动物疫病防治员国家职业标准(三级).doc VIP
文档评论(0)