08和13定额对比(08 and 13 quota contrast).docVIP

  • 9
  • 0
  • 约3.01万字
  • 约 25页
  • 2017-08-04 发布于河南
  • 举报

08和13定额对比(08 and 13 quota contrast).doc

08和13定额对比(08 and 13 quota contrast) Construction engineering valuation quota Chapter I project A geotechnical engineering (description of changes in 2013) First, artificial soil (stone) 1. Article 6: artificial excavation pile quota shall be applied to construction under the conditions of safety protection measures; (quota increase in 2013) 2. Article 8: manually excavate the hole pile and the vertical transportation in the pile shall be considered manually. If the depth exceeds 12m, the artificial dosage of 12m is multiplied by the coefficient 1.3 in 16m and multiplied by the coefficient 1.5.

文档评论(0)

1亿VIP精品文档

相关文档