港口航道施工工艺技术分析(Technical analysis of port channel construction technology).doc

港口航道施工工艺技术分析(Technical analysis of port channel construction technology).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
港口航道施工工艺技术分析(Technical analysis of port channel construction technology) Technical analysis of port channel construction technology Abstract: with the continuous development of Chinas foreign trade, port as the basis of multifunctional facilities, has become the important resources of countries and regions, is very important to regional and even national economic development. This paper mainly analyzes the construction process of the port waterway construction, the construction process of dredging engineering and the main points in the construction process. Key words: port channel; Waterway construction; Dredging works; measurement 1. Bank protection works 1) measurement According to the characteristics of the line length and elevation control requirements of the revetment, it is used to encrypt the standard points along the line and carry out strict standard point closure measurement to ensure the accuracy of each level. It is best to find a leveling point in the range of 20m to ensure the accurate control of the height of the construction. In addition, according to the construction drawing and the specification, the protection of the foundation boundary line should be set up, the foundation side piles shall be set up, the piles shall be encrypted and the protection piles shall be set up. 2) concrete foundation pouring 1. Concrete production Prior to the construction, the raw materials and concrete mix design shall be tested strictly according to the requirements. Before you make the concrete, with the scale ratio prescribed ingredients were measured in a strict way, and we will strictly according to the control of mixing time, ensure uniform mixing, so that the concrete construction slump. 2. Concrete pouring Before pouring, it is necessary to make artificial modification of the base slot, and then, after guaranteeing its qualification, it will start laying gravel pad and mould. It is necessary to ensure the stiffness and strength of the template and be stable eno

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档