网站大量收购独家精品文档,联系QQ:2885784924

混凝土施工方案参考资料(Reference materials for concrete construction projects).doc

混凝土施工方案参考资料(Reference materials for concrete construction projects).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土施工方案参考资料(Reference materials for concrete construction projects) This paper is contributed by coffee 1989 Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view. Reference material for concrete construction scheme (reference only) for reference only) 1. Project overview this project is the new teaching complex building of rongchang renyi middle school, which is 5 floors. Covers an area of 6984.85 ㎡. Ii. Construction and deployment of this project adopts commodity concrete. According to the construction process and schedule, concrete pouring shall be arranged during the day. During the concrete pouring, the management personnel shall follow the class work, be responsible for the inspection, and do the coordination work at the same time. Major machine tools 2. 2, 2, 2, 2 Architecture is the framework. Total construction 3. Construction preparation 1, technical preparation (1) according to the requirements of engineering design drawings, the engineering foundation shall excavate piles, constructional columns, fill wall columns, and female childrens wall pressure top concrete grade of C25. The remaining concrete grades are C30. (2) before concrete pouring, the implicit preview process must be inspection, including steel, template engineering and related with the professional, and made the transition and work process, can for subsequent construction. (3) the thermal insulation of concrete maintenance and block work, under the normal temperature condition, need each block in the 2 groups: the raise a set of test (28 days), with the condition maintenance a set (600 ℃. D). 2. Material preparation To contact and implement the commercial concrete in advance, calculate the concrete quantity according to the design construction drawing, and determine the dosage of various materials. Ensure adequate material for construction. 3. The machine tools shall prepare (1) according to the

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档