网站大量收购独家精品文档,联系QQ:2885784924

混凝土有关资料(Concrete information).doc

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土有关资料(Concrete information) concrete Concrete is made of gelled material, water, aggregate degree and, when necessary, adding a certain amount of chemical admixtures and mineral mixture material, according to proper proportion coordination, after even mixing, compaction molding and curing hardening of artificial stone. Requirements for concrete specimen making 1. Production requirements of concrete test parts The specimen should be cleaned thoroughly before making the specimen, and then coated with the mould. Specimen with vibration table forming, concrete mixture should be a load test, loading application spatula along the test wall slightly when inserted dao and made concrete mixture test, top of the higher vibration should try to prevent mould on the vibration table free. The vibration should continue until the concrete surface is slurry, scraping away the excess concrete and smoothing it with a spatula. The vibration table shall be the technical requirements of the concrete laboratory vibration table (JG/T3020). When the test piece is artificially inserted, the concrete mixing material shall be loaded into the test mode on the second floor, and the thickness of the material shall be approximately equal. The steel rod used for ramming shall be: 600mm long, 16mm in diameter, and round in ends. The ramming is evenly distributed from the edge to the center in the spiral direction, and the tamping rod should reach the bottom of the test die when ramming the bottom. When ramming the upper layer, the tamping rod should be in the lower depth of 20 ~ 30 mm. When the ramming stick should be vertical, it should not be inclined, and insert several times with the spatula. The number of ramming of each layer should be determined according to the cross section of the test piece. Generally, it should not be less than 12 times per 100cm2 area. After ramming, remove the excess concrete and wipe with a spatula. Specimen, using standard curing should be tried in the temperature o

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档