网站大量收购独家精品文档,联系QQ:2885784924

牵引变电所检修规程(Procedures for overhaul of traction substation).doc

牵引变电所检修规程(Procedures for overhaul of traction substation).doc

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
牵引变电所检修规程(Procedures for overhaul of traction substation) Maintenance procedures of traction substation Chapter iii acceptance and acceptance After the completion of the traction substation, the short-circuit test of the inspection and acceptance of the project shall be conducted according to the regulations, and the short-circuit test of all feeder shall be put into operation after the experience is qualified. Article 9 the construction unit shall submit the drawings, records, instructions and other completed materials to the operating unit within 10 days before the transfer and acceptance of the project. Article 10 the traction substation running. Before to take over the department to set good operation, equipment and operation and maintenance personnel training, organization learning and familiar with related equipment, regulations, system and passed the examination; Tools, materials, spare parts and safety equipment for repair and maintenance. Article 11 the system and normal management order shall be established in the operation of traction substation. Preparing technical documents according to regulations; Set up and fill in the original record, the account, the technical resume, the watch, etc. 1. The following technical documents shall be required for traction substation: 1. Single wiring diagram, planar layout of indoor and outdoor equipment, sectional drawing of outdoor power distribution device, schematic diagram of protection device, expansion diagram of secondary wiring, installation drawing and cable manual, etc. 2. Equipment specification provided by the manufacturer. 3. Test results of electrical equipment, safety appliances and insulation tools, setting value of protective equipment, etc. 2. The following raw records shall be established by the traction substation on duty (in the form shown in schedule 1 ~ 6) : 1. Log of duty: the operation of the traction substation during the shift by the attendant. 2. Record of equipment defect: the defects and t

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档