大工14春《建筑施工》在线测试1答案(Construction work online test 1 answer).doc

大工14春《建筑施工》在线测试1答案(Construction work online test 1 answer).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大工14春《建筑施工》在线测试1答案(Construction work online test 1 answer) Construction work online test 1 Select multiple choice questions 1. Single choice (20 questions, 60 points) 1. Of the following soil materials, the ones that can be used as filling are (). A. silt B. expanded soil C. Soil with 10 % organic matter content D. Water soluble sulfate is 3 % sand -- -- -- -- -- -choice: D 2. In order to ensure the safety and recharge effect of foundation pit, the distance between the backfill point and the well point should be kept (), and the precipitation and the recharge should be carried out simultaneously. A. is greater than 6 m B. less than 6 m C. greater than 5 m D. less than 5 m -- -- -- -- -- -choice: B 3. The dry density after filling soil compaction shall be in accordance with the design requirements. The minimum value of the rest () shall not be greater than 0.08 g/mm3, and should be scattered and not concentrated. A. 90%, 10% B. 80%, 20% C. 70%, 30% D. 60%, 40% -- -- -- -- -- -- choice: A 4. The vertical deviation of prefabricated pile should be controlled by (). A. within 3% B. within 2% C. within 1.5% D. within 1% -- -- -- -- -- -choice: D 5. Deep well points generally reduce water level () m. 10 to 20 A. B. 20 ~ 30 30 ~ 40 C. 40 ~ 50 D. -- -- -- -- -- choice: C 6. The base of the brick is generally put in the form of a one-in-one block, and the top layer of the bottom of the foot and the top of the wall base (the bottom of the moisture-proof layer) should be the main one. A. suitable brick B. One by one C. the plum blossom butyl D. header -- -- -- -- -- -choice: D 7. The following statement about the excavation of foundation pit is wrong (). A. The corner of the foundation pit can be used for the slope B. During the construction of the rain period, the construction of large mechanical pits shall pave the way for steel plate or roadbed C. mechanical excavation should be shallow and deep D. For some small, deep excavation, the slope should not be opened or less -- --

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档