佛山市发电厂100米烟囱人工拆除方案(Artificial demolition scheme for 100 meters of chimney in foshan power plant).doc

佛山市发电厂100米烟囱人工拆除方案(Artificial demolition scheme for 100 meters of chimney in foshan power plant).doc

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
佛山市发电厂100米烟囱人工拆除方案(Artificial demolition scheme for 100 meters of chimney in foshan power plant) The chimney of the power plant in foshan is demolished Two 100-metre chimneys to dismantle the special construction scheme Manual demolition of chimneys Made up: Chen xinxin Review: Chen xinxin Jiangsu haojiu high altitude architectural preservation co. LTD October 15, 2011 Foshan power plant chimneys demolition project (B) section Two 100-metre chimneys to dismantle the special construction scheme A chimney manually demolishing construction scheme I. preparation basis: (1) information on the layout plan of buildings provided by the tender documents. (2) site survey data, site building and pipeline layout, and surrounding environment for demolition project requirements. (3) construction department: construction machinery safety operation rules (4) technical regulations on demolition of buildings and structures (dbj08-70-98) (5) fire prevention regulations for construction site of the municipal commission and public security bureau (trial) (6) safety technical specification for structural steel pipe scaffolds (JGJ130? -2001) (7) jgj80-91. (8) construction safety inspection standard jgj59-99 (9) standard of steel pipe scaffold fastener GB1583 (10) Shanghai jianan quality supervision (2002) no. 003, suspension scaffold safety management rules Ii. Project overview: Two chimneys belong to foshan plant chimney demolition project bid (B) towering structures, reinforced concrete structure, height of 100 meters, two points AB, A chimney is located on the north of 13 # unit, B the chimney is located on the north of 12 # unit, 13 # unit south, AB chimney, north and south about 100 meters apart, A chimney demolition of total volume of 1038.5 cubic meters. The surrounding environment of A chimney is as follows: The east side is 8 meters from the retaining structure, 52 meters from the railway track, and 69 meters from the 220kV booster station of the key protection. The south side is

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档