电力施工技术交底(The power construction technology)
The following technical background, I wrote in the construction process, for reference!
Power engineering construction
Technical clarificaiton
The west road power project 0 + 073.964 ~ 0 + 528 section is 2 * 1.2 * 1.2 double channel cable ditch, 0 + 611 ~ 0 + 680 segment is 1.2 * 1.2 single ditch cable trench, and the section of green view junction is 1.0 * 1.0 single ditch cable trench. 0 + 528 ~ 0 + 611 is the pass-through. The construction of power engineering includes: backfill of earthwork, concrete bedding, brickwork of trench wall masonry, ditch wall plaster, cover plate installation, and the embedding of passing tube.
One, earthwork excavation backfill
According to construction survey researchers determine excavation line, with mechanical base trough earthwork excavation in cable trench, digging to the bottom of the cable conduit design elevation on 10 cm, with artificial stripping, leveling, overbreak are strictly prohibited, if there are any local overbreak, application of concrete filled. The soil on both sides of the groove is returned to the cable trench and the dust is completed and the acceptance is qualified. The soil backfill should be refilled and compacted, and the thickness of the backfill shall not exceed 25CM per layer.
2. Concrete pad layer:
The cable trench layer is C15 concrete, the thickness is 15CM thick, the concrete is vibrating with vibrating plate, the surface is smooth and smooth, and no vibration, honeycomb, or hemp surface can be found. In the construction of the concrete, the slope should be kept well, and a 500 x 500 by 200 water pit will be set every 60 meters. The sump pit is connected to the nearest rain well with PVC phi 150, and the collecting water in the cable trench is discharged into the rainwater well. For cable shuanggou, 240 * 240 connected holes are kept in the middle partition wall to connect the double channel bottom water pit. PVC phi 150 drainpipe is connected to the nea
您可能关注的文档
- 让xt(Let XT).doc
- 让创新成为企业习惯(Make innovation an enterprise habit).doc
- 让孩子的成长远离过敏(Keep your child away from allergies).doc
- 让和美走向幸福(Let beauty go to happiness).doc
- 让孩子在玩中体验成功(Let children experience success in play).doc
- 让每一分钱都产生其应有的效率(Let every penny produce its due efficiency).doc
- 让客户排队抢着找你(Let customers queue for you).doc
- 让库存无限接近零(Keep the inventory close to zero).doc
- 让每一天有意义一生的学习方法图书(Make every day meaningful a lifetime study method, book).doc
- 让你充满魅力的10大说话技巧(10 Amazing speaking skills to charm you).doc
文档评论(0)