电力施工技术交底(The power construction technology).doc

电力施工技术交底(The power construction technology).doc

  1. 1、本文档共19页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电力施工技术交底(The power construction technology) The following technical background, I wrote in the construction process, for reference! Power engineering construction Technical clarificaiton The west road power project 0 + 073.964 ~ 0 + 528 section is 2 * 1.2 * 1.2 double channel cable ditch, 0 + 611 ~ 0 + 680 segment is 1.2 * 1.2 single ditch cable trench, and the section of green view junction is 1.0 * 1.0 single ditch cable trench. 0 + 528 ~ 0 + 611 is the pass-through. The construction of power engineering includes: backfill of earthwork, concrete bedding, brickwork of trench wall masonry, ditch wall plaster, cover plate installation, and the embedding of passing tube. One, earthwork excavation backfill According to construction survey researchers determine excavation line, with mechanical base trough earthwork excavation in cable trench, digging to the bottom of the cable conduit design elevation on 10 cm, with artificial stripping, leveling, overbreak are strictly prohibited, if there are any local overbreak, application of concrete filled. The soil on both sides of the groove is returned to the cable trench and the dust is completed and the acceptance is qualified. The soil backfill should be refilled and compacted, and the thickness of the backfill shall not exceed 25CM per layer. 2. Concrete pad layer: The cable trench layer is C15 concrete, the thickness is 15CM thick, the concrete is vibrating with vibrating plate, the surface is smooth and smooth, and no vibration, honeycomb, or hemp surface can be found. In the construction of the concrete, the slope should be kept well, and a 500 x 500 by 200 water pit will be set every 60 meters. The sump pit is connected to the nearest rain well with PVC phi 150, and the collecting water in the cable trench is discharged into the rainwater well. For cable shuanggou, 240 * 240 connected holes are kept in the middle partition wall to connect the double channel bottom water pit. PVC phi 150 drainpipe is connected to the nea

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档