国家优质工程煤矿工程现场复查要点(Key points for the on-site review of the national quality engineering coal mine engineering).doc

国家优质工程煤矿工程现场复查要点(Key points for the on-site review of the national quality engineering coal mine engineering).doc

  1. 1、本文档共30页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国家优质工程煤矿工程现场复查要点(Key points for the on-site review of the national quality engineering coal mine engineering) Key points for the on-site review of the national quality engineering coal mine engineering I. mining construction project Main review content Information should be available Physical appearance quality Implementation specifications, standard Vertical shaft shaft engineering (1) check the vertical degree of wellbore section and shaft wall; (2) check the wall quality; (3) check the total inflow of wellbore; (4) to review the test report of concealed works acceptance record materials and test blocks, and the quality inspection and certification information of the project; (5) shaft shaft equipment quality. (1) the vertical degree of the well wall and the measured sectional drawing. (2) the completion record of the well wall, the quality level is excellent, and the physical appearance is good. (3) the total water leakage record of the wellbore is not greater than 6 tons/h. (4) concealed project acceptance records, materials and test reports. (5) the completion and acceptance record of the shaft of the shaft is completed, the quality grade is excellent, and the riding cage feels smooth. (1) specification for construction and acceptance of mine shafts in the Peoples Republic of China (gbj213-90) (2) quality inspection and evaluation criteria of coal mine shaft of the Peoples Republic of China. (MT5009-94) Inclined wellbore engineering Adit engineering (1) wellhead tunnel project; (2) shaft body engineering; (3) gutter engineering; (4) floor and step project. (1) the completion acceptance record and the quality grade are excellent. (2) raw material test and test test report. (3) wellhead, the concrete end wall of the tunnel and the surface of the wing wall are evenly balanced. There is no obvious fault platform or running mode in the stubble, the overall contour is clear, the line Angle is straight, the edge, the slope is strong, the soil and water conservation is

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档