裱糊工程施工工艺标准(938-1996)(Technical standard for construction of a project (938-1996))
Standard construction procedure for applying varnish to wood flooring (937-1996)
Construction preparation:
2.1 material requirements:
2.1.1 gypsum, white, talc, polyvinyl acetate emulsion, carboxymethyl cellulose, 107 glue or various types of wallpaper, adhesives and so on.
2.1.2: in order to ensure the quality of paste wallpaper, wallpaper, wall covering a variety of quality should meet the design requirements and the corresponding national standards.
2.1.3 adhesives, caulking putty, glass mesh cloth, etc., should be based on the actual need to design and prepare all the grassroots. But the adhesive should meet the building fire protection requirements, avoid at high temperature because of adhesive lose adhesive force, make wallpaper fall off and cause fire.
2.2 main machines and tools;
2.2.1 paper cutting table, steel ruler (1m long), wallpaper knife, towel, plastic buckets, plastic basin, oil industry to mix plate, putty groove, small roller, brush, brush, cloth, cut into silk, cotton, small white line bag, iron level, supporting board, wire, box feet, nails, a hammer, a red pencil and paper. Broom, tool bag etc..
2.3 operating conditions:
2.3.1 concrete and wall plastering has been completed, and after drying, water content is not higher than 8%; wood products shall not be greater than 12%.
2.3.2 hydropower equipment, and top wall reserved embedded parts have been finished.
2.3.3 doors and windows, paint has been completed.
2.3.4 there is terrazzo floor of the room, out of the light, waxing finished, and the surface grinding stone protection.
2.3.5 wall cleaning, if there is uneven, lack of edges, angle or local surface damage, repaired in advance and should be dry, precast concrete surface ahead of scratch gypsum putty leveling.
2.3.6 equipment components prior to the prominent wall store to be unloaded, the wallpaper paste after restoration re installed components.
2.3.7 such as