船厂(The shipyard)
The trends three seconds of memory.
[transfer] school ship didnt look too bad
[02-02 23:36]
This paper consists of Biao, no cold cool letter published in Biao space under the letter
Shipyard work on
The production department and engineering department under the general management are as follows.
Planning department: responsible for ship construction plan
Build a room in the process of ship construction: responsible for the daily management and coordination, ensure the ship according to the construction plan
Equipment room: responsible for the maintenance and management of energy facilities, construction equipment
Quality room: responsible for ship construction quality inspection system, inspection equipment and ship project management.
Then each shop.
Most new graduates are sent to the workshop site for 3-6 months of internship. (personal esteem scene for more than 6 months internship) this phase is the students for their positioning stage. You have two choices:
A after the end of the internship as a production department for management or technical personnel;
B after the end of the internship as a member of the design department. So during this time, you need to learn what? What you need to know?
Regardless of any professional,
1, must understand the whole ship construction process;
2, must understand the factory drawings issued process, use of each drawing
3, must learn to read the factory all kinds of construction drawings, drawings and gradually learn to use the design concept, to your shipyard within 1 months drawing amount can come into contact with will be in school for 4 years and more than the sum of.
4, the factory must understand the lifting capacity of heavy equipment
5, must understand the working ability of welding equipment factory
6, must learn to distinguish the meaning of the content of ship block number. As a typical numbering:
D1, D2, D3, D4: 1, installed outside the area at the bottom of 2, 3, No. 4 segment;
D31, D32, D33: 1,