- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钢结构吊装方案1(Hoisting plan of steel structure 1)
(a) the lifting column
1, column and foundation elastic line, the bottom of the cup leveling
(1) the bomb line should be installed in the center line, column three column top surface pop-up line, the basic floor elevation line. A rectangular column installation according to the geometric center line center line; I-section column in rectangular part of the pop-up center line, to facilitate observation and avoid parallax, but also in the flange of a projectile with the center line of parallel lines. In addition, in the top of the column and the top bracket also install the center line pop-up roof truss and the crane beam.
Based on the cup top line is measured according to the positioning axis of the plant, and should correspond to the center line of the column installation, as column installation, alignment and calibration on the basis of.
(2) the bottom of the cup bottom of the cup leveling leveling is a check and adjust the elevation of the bottom of the cup, in order to ensure the column after lifting the top surface elevation accuracy of bracket. The adjustment method is: first, the actual measured bottom elevation of H1, the amount of up to the top of the column bottom bracket the actual length of H2; then, according to the design standard to the top surface of the bracket and the bottom of the cup H1 actual elevation difference, available at the bottom of the column to the top bracket length H3 (h3=h-h1); second, the (H3) and the actual length measured (H2) compared to get the construction error that cup bottom elevation should be adjusted value of H (h=h3-h2=h-h1-h2), and mark in the cup; finally, the construction, with 1 to 2 cement mortar or concrete with fine stones will erase the bottom of the cup to sign. In order to make the cup bottom elevation adjustment value (H) positive column construction, cup bottom elevation control values are generally lower than the design value 50mm.
For example, the column top brack
您可能关注的文档
- 船体英文(Hull English).doc
- 船用分油机跑油故障剖析(Analysis of running oil trouble of marine oil separator).doc
- 船员实习记录簿(Crew practice record book).doc
- 醇酸树脂(alkyd resin).doc
- 船舶建造工艺流程简要介绍(Brief introduction of ship construction process).doc
- 船舶设计流程(Ship design flow).doc
- 词根记单词(Root remember words).doc
- 词汇 学科(Lexical Science).doc
- 词汇什么的有爱(What words have love).doc
- 词牌名大全(Cipai name).doc
- 部编版小学四年级下册道德与法治《期末测试卷》含答案(预热题).docx
- 部编版小学四年级下册道德与法治《期末测试卷》含答案下载.docx
- 部编版小学四年级下册道德与法治《期末测试卷》含答案【能力提升】.docx
- 部编版小学四年级下册道德与法治《期末测试卷》含答案【预热题】.docx
- 人工智能与社会发展-人工智能挑战.pptx
- 部编版小学四年级下册道德与法治《期末测试卷》含完整答案(全优).docx
- 部编版小学四年级下册道德与法治《期末测试卷》含完整答案【历年真题】.docx
- 部编版小学四年级下册道德与法治《期末测试卷》含完整答案【典优】.docx
- 部编版小学四年级下册道德与法治《期末测试卷》含答案(考试直接用).docx
- 部编版小学四年级下册道德与法治《期末测试卷》及解析答案.docx
文档评论(0)