- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钢结构施工通病(Common problems of steel structure construction)
The construction of common.Txt steel structure if pure heart, one world, a bird and a heaven. I used to love you, now I still love you want to get to where the moon can leave you smile those snowy winter, the umbrella of youth, that is blocking the door to the oath, the string of snow covered a goodbye of design drawings, approval of construction unit is not in place the duty is to map construction, but the construction units have the responsibility to deal with the construction before the construction process maps came to appear in the drawing is not perfect, not clear or not suitable for construction, does not meet the specifications of the proposed (especially for the mandatory provisions) to discuss changes and design units. If the problem will be found out, then the engineering in the construction process and acceptance is difficult, the construction quality is difficult to guarantee, cause.
We check the quality of the project, often found some problems in the design drawings:
First, design drawings and application specification is not complete, is not correct. If the design that use outdated, obsolete standards; some material level insufficiency, high strength bolt, bolt and welding connection point mark is not clear or not. For all kinds of high strength bolt, bolt, stud, rivet and washer specifications, models, performance did not specify, and these have been included in the specification and acceptance of construction quality of steel structure, as the mandatory requirements, if specified design drawings, construction and acceptance of the lack of basis, resulting in blind construction and acceptance the consequences. Second, total design does not indicate the security level and the service life of the project. The different security level of the project, the welding construction inspection requirements are also different. Safety is the highest grade, one or two grade weld welding material must be re;
您可能关注的文档
- 迪拜塔(Burj Dubai).doc
- 迪士尼攻略(Disney Raiders).doc
- 蝶与蛾的区别(The difference between a butterfly and a moth).doc
- 订车、提车、上牌、保险注意事项(The car, the car on the card, insurance matters needing attention).doc
- 都市对话01(City dialogue 01).doc
- 豆瓣-第十放映室栏目组与你一起大话电影!(You're talking big movies with your group in the tenth screening room!).doc
- 豆腐的四大营养绝配(Tofu four nutritious.).doc
- 读《不要随意砍伐树木》有感(Read don't cut down trees at random).doc
- 读《阅读儿童文学》有感(Reading reading children's Literature has a sense of).doc
- 读《在与众不同的教室里》有感(Reading in a different classroom has a sense of).doc
- PDM软件:Siemens Teamcenter二次开发_(17).Teamcenter最佳实践与案例分析.docx
- SCADA软件:GE Proficy二次开发_(4).Proficy开发环境搭建.docx
- 智能电表软件:Landis+Gyr智能电表二次开发_(13).系统集成与测试.docx
- 智能电表软件:Elster智能电表二次开发_(8).Elster智能电表二次开发环境搭建.docx
- PDM软件:Siemens Teamcenter二次开发_(11).TeamcenterAPI与编程基础.docx
- SCADA软件:GE Proficy二次开发_(7).报警与事件管理.docx
- 智能电表软件:Echelon智能电表二次开发_(11).智能电表行业标准与法规.docx
- 智能电表软件:Itron智能电表二次开发_(6).用户界面定制与开发.docx
- 智能电表软件:Elster智能电表二次开发_(9).Elster智能电表二次开发工具使用.docx
- PDM软件:PTC Windchill二次开发_(21).Windchill最佳实践案例分析.docx
文档评论(0)