网站大量收购独家精品文档,联系QQ:2885784924

钢筋工程交底(Reinforcement project disclosure).doc

钢筋工程交底(Reinforcement project disclosure).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钢筋工程交底(Reinforcement project disclosure) Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. Technical disclosure records Construction unit: Jiaozuo Hongcheng construction limited liability company engineering name: name of project content disclosure Zhengzhou information Creative Industry Park Investment Center in April steel works First, be familiar with the drawings, in strict accordance with the design requirements and the production and assembling construction change notice. Two, ready to work: 1, check the reinforced steel products, diameter, shape, size and quantity of the material is consistent with the single card, if errors should be corrected added. 2, prepare for lashing the wire binding tool, lashing frame etc.. Reinforced lashing the wire, available 20 ~ 22# wire, 22# wire which used only for bar diameter below 12mm. 3, to control the concrete protective layer pad for. Pad thickness should be equal to the thickness of the protective layer, pad size of the plane when the protective layer thickness is equal to or less than 20mm is 30mm * 30MM, more than 20mm, 50mm * 50mm. 4, line drawn steel, steel plate or wall, in the template lines; column stirrups, partition points on the two diagonal main bar; beam stirrup in erect steel cross point; foundation reinforcement, in two to take a row or line in reinforced cushion. Reinforced joint position, it staggered the template lines. 5, the length of lap joints in strict accordance with the regulations. 6, the formation of binding structure complex part, each reinforced schedule should first study the order and order of contact to discuss supporting formwork modules and assembling reinforcement, in order to reduce the difficulty of assembling. Three, column: vertical reinforcement lap 1, column reinforcement, hook corner rebar should be 45 degrees with the template, the hook should be reinforced among 90 degrees with the template

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档