- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
竣工图类型内容与要求(Completion drawing type, content and requirement)
Type completion map contents and requirements
The completion of the completion of construction projects is an important part of archives, is the engineering construction after the completion of the main document materials, is a building of true portrayal, is a necessary condition for the completion of the project acceptance, engineering maintenance, management, renovation and expansion of the basis. The new construction, renovation and expansion projects must be completed the preparation of map.
1, preparation requirements
1.1 where no changes according to the construction drawings, the completion drawing unit to sign near blank in the construction of Tutu stamped and signed completion seal.
1.2 where the general drawing changes according to the change unit according to the design, directly redrawing the construction plans, and stamped and signed completion seal.
All 1.3 significant changes in structure, process, layout, project and surface change of more than 40%, should be re drawing completion drawings. Re drawing of the drawings must have the name and figure number, figure number according to the original number.
1.4 prepare as built drawings must prepare drawings completed the professional directory, drawing drawings must be accurate and clear, complete and standard, modifications must be in place, reflect the actual situation of the project completion acceptance.
1.5 for the redrawing of completion drawings must be drawn blueprint or plotter white figure may not use the copy of the drawings.
1.6 completion drawing units shall be in accordance with the specification requirements of national construction drawing drawing completion drawing ink drawing pen or pen and color use.
2, the main content
2.1 completion drawings shall be by engineering units, and according to the professional, classify and organize system.
2.2 plans include the following:
2.2.1 process layout drawings
The completion of the build
您可能关注的文档
- 高考作文文体(Composition style of college entrance examination).doc
- 高炉炉顶布料器的故障及检修(Trouble and overhaul of distributor for blast furnace top).doc
- 高炉冶炼对铁矿石的要求(Requirements for iron ore smelting by blast furnace).doc
- 高耐候性外墙乳胶涂料的研制(1)(Development of high weatherability exterior wall latex coating (1)).doc
- 高强度钢的抗拉强度定义(Definition of tensile strength of high strength steel).doc
- 高强度螺栓连接(High strength bolt connection).doc
- 高强化学螺栓施工技术(Construction technology of high strength chemical bolt).doc
- 高强螺栓(High-strength bolt).doc
- 高韧性高铬铸铁衬板的研制与应用(Development and application of high toughness high chromium cast iron liner).doc
- 高三化学总复习《硫酸》学案(The chemistry review of the third year of senior middle school -- sulfuric acid).doc
最近下载
- 标准的个人简历表格[空白].doc VIP
- 开放系统11879《小学语文教学研究》期末机考真题及答案(第102套).docx VIP
- 2025年新教科版科学四年级下册全册知识点(超全版).pdf
- 《sm-3酶标仪说明书》.doc VIP
- 3篇《严禁违规操办“升学宴廉政承诺书》谈话记录.docx VIP
- 2025中国工商银行软件开发中心社会招聘笔试备考题库及答案解析.docx VIP
- 老年常见病的预防与照护教学大纲.docx
- 六年级科学上册(教科版)全册同步练习(含答案).pdf VIP
- 2025年新人教版七年级下册历史全册知识点(新教材).pdf VIP
- 基于项目式学习的初中生物综合实践活动案例论文.docx
文档评论(0)