电气化铁路接触网钢支柱 第1部分格构式支柱(Electrified railway; contact net; steel support; first part; latticed support).docVIP
- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电气化铁路接触网钢支柱 第1部分格构式支柱(Electrified railway; contact net; steel support; first part; latticed support)
Electrified railway catenary steel pillar first part lattice pillar.Txt what is myth? Please listen to men love you; what is legend? Please listen to the man of your commitment; what is the dream? See you hear the reaction when. This paper contributed by zys5609.
Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view.
29.280 ICS 29. S 82
TB
TB/T 2921.1 - 2008
Instead of TB/T 2921 - 1998
Peoples Republic of China railway industry standard
Electrified railway catenary pillar first parts: lattice type pillar
Steel pole for overhead contact system of electrified railway Part1:Lattice pole
The release of 2008-01-25
The implementation of 2008-01-25 release
Ministry of Railways of the Peoples Republic of China
TB/T 2921.1-2008 2921.1-
order
The topFan 9
second
Words...... Wai ii...... 1 normative references...... 1 terms and definitions...... 1 Classification and nomenclature...... 2 technical requirements...... 4 test methods...... 7 inspection rules...... 9 mark and certificate...... 10 storage and transportation...... Ten
I
TB/T 2921.1-2008 2921.1-
Front
word
TB/T 2921 electrified railway catenary steel pillar is divided into four parts: - part first: lattice pillar; - Part second: square steel tube pillar; - Part third: steel pillar; - Part fourth: H shaped. This part is the first part of TB/T 2921. In this part, instead of TB/T 2921 - 1998 electrified railway contact net steel column. This part of TB/T 2921 and 1998 compared with the main changes are as follows: - adjusted some normative references; adds a straight leg bridge steel column; - modify the provisions on the deflection of steel columns; -- adjustment, change the part of the project and tolerance. This part of the China Railway Electrification Bureau Group Co. Ltd. and focal points. This part of the drafting unit: Rai
您可能关注的文档
- 经济管理系模拟实训室 项目采购人设定实质性需求条款情况说明表(Economic management department simulated training room, project buyer set up substantive demand terms, the status of the table).doc
- 经筋医学完整资料(Complete medical data).doc
- 经人为本 改革创新 构建和谐新计量院(Building a harmonious new measuring institute through the reform of human centered reform).doc
- 经销商困局下的市场突围(Dealers market breakout under the predicament).doc
- 经椎间动脉栓塞法建立急性脊髓缺血损伤模型(A model of acute spinal cord ischemia injury was established by intervertebral artery embolization).doc
- 精彩美剧剧目(Wonderful American drama).doc
- 精怪班主任 和调皮鬼过招让90后、00后学生心悦诚服(Demon teacher and mischievous ghost blows to the 90, 00 after convincing students).doc
- 精加工新技术(Fine machining new technology).doc
- 精馏塔开停车步骤(Rectification tower opening and stopping steps).doc
- 精美摘抄,献给每一位有理想的大学生(Exquisite excerpt, for every ideal college).doc
文档评论(0)