- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电气配管及管内穿线的施工方法(Construction method of electric piping and pipe threading)
(1) the construction process
The construction procedure of laying underground pipe A.: construction preparation - Determination of box, box, box, fixed position, pipeline connection deformation joint treatment, grounding prefabrication pipe bending.
The construction procedure of B. pipe laying is: construction preparation, prefabrication pipe bending, support and hanger to determine the box, box and a fixed point, fixed bracket, hanger, box fixed, pipeline laying and connection, deformation joint treatment, ground treatment
The construction procedure of laying underground pipe C. plastic electrical: construction preparation, prefabrication pipe bending, determination of box, box, box, fixed position, deformation joint of pipeline connection processing
The construction procedure of D. plastic electrical pipe laying is: construction preparation - determine box, box and a fixed position to support and hanger installation, pipeline laying and connection box, box, fixed deformation joint treatment
E. threading pipe construction procedure: construction preparation - selection of conductor, cable, pipeline cleaning, wear line and line, wire and belt line, with the mouth, lashing wire connection, wire welding, wire wrapped to the line to check the insulating shake measure
(2) the main construction methods and technical measures
1) underground pipe laying
The basic requirements of laying underground pipe for A. wire line, pipe, pipe laying in dusty and damp places at the connection must be sealed; wire line arranged along the shortest line and minimize bending, buried in concrete wall or pipe, from the surface of the net distance of not less than 15mm; embedded wire line not through the underground equipment foundation.
B. prefabrication:
The galvanized steel pipe diameter is 20mm and below, with great bend elbow; diameter 25mm and above, the use of hydraulic bending machine; plastic pipe bending sprin
您可能关注的文档
- 经人为本 改革创新 构建和谐新计量院(Building a harmonious new measuring institute through the reform of human centered reform).doc
- 经销商困局下的市场突围(Dealers market breakout under the predicament).doc
- 经椎间动脉栓塞法建立急性脊髓缺血损伤模型(A model of acute spinal cord ischemia injury was established by intervertebral artery embolization).doc
- 精彩美剧剧目(Wonderful American drama).doc
- 精怪班主任 和调皮鬼过招让90后、00后学生心悦诚服(Demon teacher and mischievous ghost blows to the 90, 00 after convincing students).doc
- 精加工新技术(Fine machining new technology).doc
- 精馏塔开停车步骤(Rectification tower opening and stopping steps).doc
- 精美摘抄,献给每一位有理想的大学生(Exquisite excerpt, for every ideal college).doc
- 精密空调与普通家用空调区别(The difference between precision air conditioner and ordinary home air conditioner).doc
- 精明主妇教你省钱妙招(A smart housewife teaches you how to save money).doc
- 2024中国电影年度市场研究报告.pdf
- 2025超级Agent在工作场所:赋予人们释放人工智能全部潜力的力量.pdf
- 2025营养趋势报告.pdf
- 2025年中国民营航天及地月经济带商业发展前瞻.pdf
- 上海喜美医疗美容品牌升级规划.pdf
- 2025清华大学104页《DeepSeek:从入门到精通》.pdf
- 2025中国金融大模型洞察企业竞争分析:金融大模型,铸就企业核心竞争力(阿里云·百度云·华为云·商汤科技).pdf
- 2024 TikTok 在开启商业新时代中的角色购物者和企业(英译中).pdf
- 2025智能应用的最佳实践:面向决策者的负责任AI指南.pdf
- 2025-2100 年中国人口预测与政策建议.pdf
文档评论(0)