- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
房地产的成本测算(Cost estimation of real estate)
Here are my in Fujian, a Fuzhou real estate cost estimates, let you know the real estate profits! All the prices here are to present each of the Fujian in Fuzhou has completed sale of the highest and most unfavorable price to calculate the square!
The 2XXX beat -XX plots (Jinzhou Road)
The main planning index: 1, land area: 27102 square meters (40.65 acres)
2, the volume rate: 2.4 (commercial 7%)
3, building density: 28%
4, planning green rate: 30%
5, planning the following layers: 15 layers
6, cultural activity room: 300 square meters of public toilets, 60 square meters, 60 square meters of health service station;
Cost calculation:
First, the volume rate of 2.4, covers an area of 27102 square meters (40.65 acres) building density: 28%
Basal area: 7589 square meters
Two, the building area of 2.4X27102=65045 square meters
Which store: 4553 square meters residential: 60072 square meters: 300+60+60=420 square meters
(70%): multi-storey residential high-rise residential 42050 square meters (30%): 18022 square meters
Overhead floor area: 7589-4553-420=2616 square meters
Three, the total area of 65045+2616=67661 square meters
Four, cost calculation:
1, construction and installation cost:
Overhead cost: 550 yuan / square meter (27102X0.28-4553) /67661X550=25 yuan / square meter
Dont take the elevator housing cost: 700 yuan / square meter 42050/67661X700=435 yuan / square meters
Take the elevator housing cost: 900 yuan / square meter 18022/67661X900=240 yuan / square meters
Storefront and construction cost: 700 yuan / square meter 4973X700/67661=2 yuan / square meters
2, permanent water equipment, construction cost: 10 yuan / square meter.
3, permanent electricity construction, equipment cost: 35 yuan / square meter.
4, supervision cost: 7 yuan / square meter.
5, the road and wall cost: 15 yuan / square meters
6, green fee: 10 yuan / square meter
7, drawing design fee: 12/ yuan / square meter
8, the drilling cost: 3 yuan / square met
您可能关注的文档
- 电力营销稽查监控主题需求(Power marketing, audit, monitoring, theme demand).doc
- 电力专业知识(Power professional knowledge).doc
- 电炉炼钢烟尘的综合利用[1](Comprehensive utilization of smoke and dust in EAF steelmaking [1]).doc
- 电路改造和吊顶(Circuit modification and ceiling).doc
- 电路改造和吊顶经典(Circuit reconstruction and ceiling classic).doc
- 电路基础08(Circuit Fundamentals 08).doc
- 电路识图(Circuit diagram).doc
- 电磨使用技巧(Grinders use skill).doc
- 电路图的知识(Knowledge of circuit diagrams).doc
- 电脑防辐射(Computer radiation protection).doc
文档评论(0)