网站大量收购独家精品文档,联系QQ:2885784924

建设工程造价管理(2013年版)修改(Construction cost management (2013 Edition) revision).doc

建设工程造价管理(2013年版)修改(Construction cost management (2013 Edition) revision).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建设工程造价管理(2013年版)修改(Construction cost management (2013 Edition) revision) The construction project cost management (2013 Edition Modify) The materials with the Ministry of housing and urban construction, the Ministry of finance cost of construction and installation project components (standard 2013. No. 44), the Ministry of housing and urban construction construction contract pricing and contract management approach (Ministry of construction order No. sixteenth), The construction project quantity list pricing norms GB50500 - 2013, and discipline development, has made some modifications A number of typographical errors and correct. The original is not correct and modify the contents of textbooks, please refer to the table of readers. The original location of revising and editing staff list second line from the bottom The fourth chapter written Xu Yuanming Chongqing University Xu Yuanming Chongqing University prepared the fourth chapter, the sixth chapter. The first chapter Page second of first lines (two) the characteristics of project valuation to project valuation characteristics (two) The second page 1.1.1 in Figure 1.1.1 to modify the P4 Page second figure 1.1.1 the 3 line (2) to estimate cost (2) project budget Page second figure 1.1.1 the 7 line (3) revised estimates cost to (3) revised estimates Page second figure 1.1.1 the 10 Line (4) to (4) the budget cost of construction drawing budget Figure 1.1.1 control second page No. 12 ~ thirteenth before one phase of the project cost. Not every project is to determine the budget cost. At present, some projects need to determine the tender control In order to limit the highest bid price. To the previous stage engineering cost control. At present, according to the current code of valuation with bill of quantities, some projects need to determine the tender price control to limit the highest bid price. Page second figure 1.1.1 the 19 line (6) settlement price: refers to the completion of the project acceptance stage. To

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档