- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑 市政(Municipal Construction)
Municipal building.Txt
Select: 1 on the cast-in-situ reinforced beam by elastic soil + 2 hammer pile sinking method + size 3 the ground surface layer + 4 + ordinary ordinary terrazzo surface climate 5 on fine aggregate + good fine 6 a compression bar + 7 + FREE fixed in the environment to improve the 8 ladder placed +a small icon B 9 in the non earthquake zone in round 10 + on + frame node on the level of concentration 11 according to the general silicate + except Portland cement 12 by wet up by + 13 the following warping plastic wallpaper + waterproof wallpaper 14 according to concrete structure reinforcement + outer surface 15 of the construction control net + Distance Intersection Method of foundation pit excavation project 16 + 17 8 meter span reinforced concrete rib floor +100% 18 + no paste pretensioned slab 19 steel structure anticorrosion coatings on hard + 20 on the wall tile + base - - - brick brick row thoroughly soaked 23 21BD22CDE without 24AE 25ABCD E 26ABC 27ABE 28BE (no more rolls)
A case:
Event: reinforced reinspection should not exceed 60 tons, two deficiencies, the units chief engineer can not be added to the members of the expert group. Should not be left to present oral argument opinion, should be hazardous project safety special construction plan shall be borne by the project manager, technical director of the project or project of professional and technical people.. Project division led system, and will be demonstrated by experts in the special program submitted to the audit supervision engineer responsible for the organization of technical instructions, by the special review meeting and to the construction unit, supervision unit. Project manager of the relevant departments, sub units were written. The event, three: longitudinal horizontal bar should be set up in the medial pole, the length of not less than three across two adjacent longitudinal level bar street is not easy to set up in a synchronous or within the
您可能关注的文档
- 生气(get angry).doc
- 生娃(Baby).doc
- 生物。(Biology。).doc
- 生物化工与环境工程学院学士学位申请书填写说明(Application for bachelor's degree in biochemistry and environmental engineering).doc
- 生物化学练习题——蛋白质生物合成(Biochemical exercises -- protein biosynthesis).doc
- 生物名家3(Biology expert 3).doc
- 生物易错(Biological error prone).doc
- 生育前后都有培训(Training both before and after childbirth).doc
- 田宫涂料色表(Paint color chart).doc
- 田螺的高产养殖技术(High yield cultivation technology of the snail).doc
最近下载
- 热分布报告样本.pdf
- 2025年一建一级建造师建筑实务案例分析考点重点知识总结高分笔记.pdf VIP
- 手足口病的诊断与治疗课件.ppt VIP
- 会计法律法规答题答案.doc VIP
- 我国商业银行开展绿色信贷业务存在的问题和对策.docx VIP
- 医院消防安全除患整治攻坚行动工作总结8篇.docx VIP
- 《桃花源记》比较阅读85篇(历年中考语文文言文阅读试题汇编)(含答案与翻译)(截至2020年).doc
- 2025年北京东城区高三一模高考英语试卷试题(含答案详解).docx
- 2024潍坊护理职业学院招聘笔试真题及参考答案详解一套.docx VIP
- 年产300吨2-乙酰呋喃分离工段的工艺设计.docx
文档评论(0)