建筑施工(一)试题05年01月份(Building construction (1) examination questions 05 years 01 months).docVIP

建筑施工(一)试题05年01月份(Building construction (1) examination questions 05 years 01 months).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑施工(一)试题05年01月份(Building construction (1) examination questions 05 years 01 months) This paper contributed by feiyang8720. Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. Self-study examination of higher education in China in January 2005 The construction item (a) Course Code: 02400 A single choice (in each item of four answer options, choose a correct answer, and correct answer multiple-choice questions in number fill every day of the four answers, choose a correct answer, in every day of the four answer options in the brackets. In the brackets. Every day 2 points, a total of 20 points) 1. when the soil permeability coefficient between 0.1 ~ 50m/d, the depth of precipitation is less than 6m, can choose A. (a light well point tube wells A.30% A. C. A. A. C. neck butt anchorage relaxation 6. post tensioned anchorage bar (A., can only help for the fixed end C. in tension and the fixed end can be A.1/2 A. and C. base firmly bonded to make the surface smooth and meticulous when using 10. A.2 (A. crawler crane C. tyre crane two, fill in the blanks (each 1 points, a total of 10 points) volume loose state each 11. excavation after fill in the volume and the natural condition is 12., the depth and the moment called the three elements of sheet pile design . We can transport and piling. The construction process. Or pre buried corrugated pipe method.. To achieve the strength of concrete crane, crane attachment and climb 13. prefabricated reinforced concrete pile design strength of 14. concrete engineering including concrete preparation, transportation, pouring and tamping and 15. post tensioned construction, curved channel setting mortar with 16. brick masonry mortar plumpness level shall not be lower than 17. tower crane commonly used, according to the way of walking and the structure is divided into The first - Page 3 - Precipitation method). The light well point D. B. multistage deep

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档