搅拌桩、静压桩(Mixing pile and static pressure pile).docVIP

搅拌桩、静压桩(Mixing pile and static pressure pile).doc

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
搅拌桩、静压桩(Mixing pile and static pressure pile) Construction quality control measures of cement mixing pile As everyone knows, in the construction of soft clay foundation, cement mixing pile construction is one of the common processing methods. Its main features are: reasonable construction period, low voltage operation, safe and reliable, less pollution, no vibration, no noise, no adverse impact on the surrounding environment and buildings. How can increase the bearing capacity and reduce the amount of compression of the soft soil foundation of soft soil foundation, the key is to control the construction quality of cement mixing pile. 1 quality control, construction preparation work 1.1 construction preparation and site preparation 1.1.1 pavement construction machinery approach should be repaired; 1.1.2 power supply facilities should be complete. At the construction site, no external power supply, should be equipped with diesel generators; 1.1.3 identify the obstacles within the scope of the construction. There is no underground rock and underground pipelines, the air has no high voltage wire etc.. All obstacles should be eliminated or the establishment of clear signs to ensure safety in production; 1.1.4 site formation. In preparation for construction of mixing pile lots, first used bulldozers to surface rough flat, then backfill sand cushion, and fine flat grader. Local conditions, availability of hydrostatic roller 1 ~ 2 times. 1.2 construction lofting First, with a total station (or theodolite) accurately released paragraph pile and construction starting line, and then use the ruler according to the design requirements of the pile away from the sticks in the construction within the scope of marked pile (general regular triangle arrangement). The quality control of raw materials 1.3 1.3.1 cement (curing agent) quality is the key, the variety and quality of cement shall comply with the requirements of design and specification. Cement before entering, must do sampli

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档