毕业设计任务书(Graduation design task book).doc

毕业设计任务书(Graduation design task book).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业设计任务书(Graduation design task book) Graduation project of Huazhong University of Science and Technology Design topic: a factory building in Nanning I. General Provisions The purpose and requirement of graduation project: Graduation project is a comprehensive teaching link based on the completion of specialized courses. It takes practical engineering as the subject. In the whole process of the graduation design expired, students under the guidance of teachers, through the practice of graduation design, study and implement the applicable, safety, economy, and attention to beauty in the class construction policy under the conditions of applying the theoretical knowledge to solve practical engineering problems, improve the ability to analyze and solve problems, to the actual engineering design exercise. Through the structural design and construction organization design of the actual project, the design principles, methods and steps are preliminarily mastered, and the basic training of design skills is obtained. In order to achieve the above goal, students must be strict with themselves and give full play to their initiative and initiative. They should complete the tasks stipulated in each part of the graduation project at the prescribed time. Two. Design the original data 1, scale: total floor area m2, layer number layer; 2, the construction unit office location: main street; 3. Fire prevention requirement: building belongs to first class fire prevention standard; 4, construction standards: 1000 yuan / m2 (including water and electricity prices); 5. The upper and lower water can be settled by the city pipe network; 6. The power supply is solved by the urban power grid; 7. Meteorological and hydrogeological conditions: The wind rose: summer and winter wind blowing Sheng Chuidong, northeast wind; The temperature in the hottest month: the average 29oC, the lowest average 13.529oC; Rainfall: the annual rainfall is 1255.1 millimeters; Ground water: no erosion, less than 8 m

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档