李挣扎的施工考试(Li struggled for the construction exam).docVIP

李挣扎的施工考试(Li struggled for the construction exam).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
李挣扎的施工考试(Li struggled for the construction exam) Fill in the blanks (a total of 10 questions, 2 points per subject) 1. The three elements of force are size, direction, and point of action. The line of action of force is the straight line indicating the arrow in the intention. 2, seasonal construction mainly refers to the winter and rainy season construction process. 3. When pouring concrete, the free dumping height shall not exceed 2 meters, and shall not exceed 3 meters in vertical structure. In case of excess, a series of tubes and conduits shall be used to prevent concrete segregation. 4. The reinforced concrete structure is composed of several sub items such as steel bar, formwork and concrete. 5, the technical disclosure of the main written manner, oral disclosure supplemented by, if necessary, supplemented by drawings, the two sides should sign the handover. 6, steel joint connection methods are overlap, welding and thread connection. 7. The pouring of mass concrete structure can be divided into four layers, such as comprehensive delamination, sectional delamination, slope delamination and so on. 8, concrete inspection and evaluation are divided into statistical law, non statistical method of two, 9, waterproof project according to its use materials can be divided into flexible waterproof and rigid waterproof two major categories. 10, the brick wall of the main form of construction has one, a small, three, a small, plum ding. Two, radio questions (a total of 10 questions, 2 points per subject), 1, determine the strength of concrete, the standard test specimen is (C) mm. A. 70.7 x 70.7 x 70.7 B. 100 x 100 x 100 C. 150 x 150 x 150 D. 200 x 200 x 2002, building a total width of 13m, roof slope is 2% (both sides of the slope, horizontal) roof height is the central rise (A) A, 130 mm B, 150 mm, 200 mm, D C 260 mm 3, the aseismic requirements, the stirrup hook straight part length should be at least A (D), 3D B, 5D C, 6.25d D, 10d 4, the impermeability requirements

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档