- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
北航《建筑施工技术》在线作业二(The northern construction technology online homework two)
First, radio 1-5:BCABB
Two 1:BC 2:ABCD 3:ABCDE 4:BCD 5:ABCDE and more
6:ABD, 7:ABCD, 8:ACD, 9:ABCD, 10:AC
Three, judge 1-5:BBABB 6-10:AABBB
First, radio questions (5 questions, 20 points) V
1. (B) refers to the performance of soil through water
The porosity of A. soil
Permeability of B. soil
C. soil moisture content
Coefficient of relaxation of D. soil
Full marks: 4
2. quality inspection after concrete maintenance: (C)
A. shear strength check
B. split check
C. compressive strength check
D. flexural strength test
Full marks: 4
3. (A) is the most widely used waterproof method in our country
A. asphalt waterproof roll
B. polymer modified asphalt waterproof roll
C. synthetic polymer waterproof roll
D. other waterproof rolls
Full marks: 4
4. units of construction plan, first determine (B) location
A. warehouse
B. lifting equipment
C. office building
D. Road
Full marks: 4
5. semi-rigid pavement means (B)
A. subgrade is rigid cushion and pavement is flexible
B. cushion; rigid pavement; flexibility
C. pavement; rigid cushion; flexibility
Both the D. cushion and the pavement are semi-rigid
Full marks: 4
Two, (a total of 10 multiple-choice questions, a total of 40 points.)
The order of removal of the V 1. template is generally (BC)
A. first, first
B. after the first branch of the demolition
Disassembly of the posterior ramus of C.
Posterior removal of the posterior ramus of D.
Full marks: 4
2. prefabricated piles are divided into (ABCD) according to the method of pile driving
A. hammer to sink the pile
B. static pile
C. vibratory pile driving
D. water flush pile
Full marks: 4
3. the fittings of the composite steel formwork include (ABCDE)
A. U card
B. L - type bolt
C. hook headed bolt
D. fastening bolts
E. fastener
Full marks: 4
4., according to waterproof coating, the main component of film-forming material, coating is divided into (BCD)
A. solvent based waterproof coating
B. asphalt base waterproof co
您可能关注的文档
- 杜拉斯和《物质生活》(Duras and material life).doc
- 法国读语言参考(French reading language reference).doc
- 法国红酒五大名庄正牌和副牌酒(Five famous French wine Zhuang and genuine second wine).doc
- 法国景点介绍(France attractions).doc
- 洞箫入门之学(Xiao entry learning).doc
- 废料白银的提取方法废料白银的提取方法(Extraction method of waste silver, extraction method of waste silver).doc
- 法律人才培养模式比较 - 海南大学(Comparison of legal personnel training mode - Hainan University).doc
- 法律硕士与法学硕士之比(Master of laws and master of laws).doc
- 废料白银提取方法(Method for extracting waste silver).doc
- 法律人的出路(The outlet of legal person).doc
- 2025年高考全国一卷数学真题-答案.pdf
- 2025步步高大一轮复习人教版化学练习 第十章 第41练 新型化学电源分类突破.docx
- 2025丹东市事业单位考试历年真题.docx
- 2024秋新湘少版英语三年级上册教学课件 Let's Know More The five sens.pptx
- 2025步步高大一轮复习人教版化学练习 第四章 第11练 碳酸钠和碳酸氢钠 钠及其化合物的相互转化.docx
- 2025步步高大一轮复习人教版化学练习 第五章 第17练 氯及其重要化合物的转化关系.docx
- 2025年广东高考真题化学试题.pdf
- 2025丹东市元宝区事业单位考试历年真题.docx
- 2025年骨骼健康益生菌品牌推荐:市场规模·十大品牌·排行榜.docx
- 2025大同市新荣区事业单位考试历年真题.docx
文档评论(0)