网站大量收购独家精品文档,联系QQ:2885784924

变压器的大修项目及要求(Transformer overhaul projects and requirements).doc

变压器的大修项目及要求(Transformer overhaul projects and requirements).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
变压器的大修项目及要求(Transformer overhaul projects and requirements) Transformer overhaul projects and requirements 1. hanging bell bell or hanging body overhaul: 2. coil, lead and magnetic (Electrical) rating device overhaul 3. iron core, iron core fastener (through screw clamps, strap, strap, etc.) the pressure screw connecting pieces and even repair tablets 4. tank and accessories overhaul, including casing, moisture absorber and so on 5. maintenance of auxiliary equipment such as cooler, oil pump, fan, valve, pipe and so on 6. maintenance of safety equipment Maintenance of 7. oil protection device The effect of temperature measuring device 8., gas relay (pressure protector) effect 9. maintenance and test of operation control box 10. overhaul of no excitation tap changer 11. replacement of all sealant gaskets and component leakage test 12. drying the insulation of the machine when necessary 13. transformer oil treatment (vacuum filter oil) or oil change 14. clean the tank and do fuel injection paint and anti-corrosion treatment 15. after the overhaul test and trial operation What are the items of power transformer inspection and maintenance? I. overhaul Overhaul cycle is generally 5 years. Its overhaul items are: (1) maintenance of shell and oil. Check and clean the shell, including the top cover, oil conservator, high and low voltage insulating sleeve, safety air passage, radiator and so on, and eliminate the leakage. Filter oil or oil change according to transformer oil condition. Inspect and repair earthing device. Re coat the case when necessary. (2) overhaul of core and winding. Check core grounding and insulation piercing screw; inspection and cleaning winding and winding wire clamping device, etc.. Check whether the winding insulation is good and whether the gasket is firm, there should be no coil looseness, deformation and displacement, as well as the primary and secondary side winding asymmetric phenomenon of two. (3) overhaul of tap changer. Check and repair tap

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档