网站大量收购独家精品文档,联系QQ:2885784924

东大12秋学期《采矿学(下)》在线作业3(East 12 autumn semester, mining (next) online homework 3).doc

东大12秋学期《采矿学(下)》在线作业3(East 12 autumn semester, mining (next) online homework 3).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
东大12秋学期《采矿学(下)》在线作业3(East 12 autumn semester, mining (next) online homework 3) The 12 fall semester to study mining (below) online homework 3 A RadioButtonList 1. open-pit mine production capacity refers to the quantity of rock mined ore quantity and peeling. A. monthly B. weekly C. year D. every day Answer: C 2. surface blasting fashion medicine structure can be divided into continuous loading and. A. decoupling charge B. divided charge C. continuous loading D. hole bottom charge Answer: B The 3. is used to distinguish the boundary grade ore and rock grade value. A. limit Critical B. The lowest C. The highest D. Answer: B 4. on the basis of each planning period and the total time span, open-pit mining plan can be divided into long-term planning, short-term plan and daily operation plan. A. cycle The length of time B. C. time The length of D. Answer: B 5. belt conveyor transport capacity, ascending slope capacity, can reach 16o ~18o transport routes, short distance, about car distance 1/4~1/5, distance railway 1/10~1/5, thus to develop infrastructure engineering pit line is small, high degree of automation, transportation, high labor productivity. The high cost of transportation A. B. low transportation cost C. is easy to transport D. infrastructure costs low Answer: B The 6. step is mainly a function of rock slope angle. The stability of A. The compressive strength of B. C. integrity D. degree of fracture Answer: A The 3D geometry 7. delineation of mining reserves called the final mining boundary, it is expected in the mine at the end of the size and shape. A. dump B. stope C. site D. orebody Answer: B 8. in order to improve the excavator production capacity, should adopt the way of loading and transportation equipment selection of excavator, excavator to shorten the work cycle time. A. way of walking B. for car C. uninstall way D. loading method Answer: B 9. loading and transportation are inextricably linked, mutual influence,. A. correlation B. connection C. inte

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档