32、预制钢筋混凝土隔墙板安装工艺标准(432-1996)(32, precast reinforced concrete partition board installation process standards (432-1996)).docVIP

32、预制钢筋混凝土隔墙板安装工艺标准(432-1996)(32, precast reinforced concrete partition board installation process standards (432-1996)).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
32、预制钢筋混凝土隔墙板安装工艺标准(432-1996)(32, precast reinforced concrete partition board installation process standards (432-1996)) Standard for installation of prefabricated reinforced concrete partition walls (432-1996) 1, scope The process standard is applicable to the installation of non load inner diaphragms for civil buildings. 2 、 construction preparation 2.1 materials and main equipment: 2.1.1 reinforced concrete prefabricated partition board: the quality shall comply with the quality inspection and evaluation standard for reinforced concrete prefabricated components, and the factory certificate shall be issued. The type and reverse sign shall be marked on the wallboard, and the inspection certificate shall be enclosed. 2.1.2 welding rod: E43 type welding rod should be factory certificate. 2.1.3 connecting steel plate: generally 40 * 60 * 40 * 4 (mm). 2.1.4 connection steel bar: General diameter shall not be less than Phi 10, length 100~120 (mm). 2.1.5 cement: No. 425, No. 525. 2.1.6 main machines: hoisting machinery and tools with main structure. 2.2 operating conditions: 2.2.1 keep the partition board in accordance with the layout plan of the construction site. The storage site shall be level and solid, and prevent water and subsidence. The inserting and lowering frame for storing partition board should be firm and stable. Partition boards shall be stored in different sizes. 2.2.2 check the plate number according to the design drawings, and check whether the embedded iron pieces on the board are complete, and clean up the sundries and rust. The hanging rings on the partition board should be complete and firm. 2.2.3 on the floor of the installation, clean up the installation site, in the partition board adjacent to the main structure, play the wall board, install the location of the location of the vertical line. Play a flat panel position line on the floor. Write the panel type on the outside of the floor mounting position. 2.2.4 check the structure, wall and floor,

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档