- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Lead time Reduction Using Lean Manufacturing (使用精益生产交货时间减少)
Global Journal of Finance and Management.
ISSN 0975-6477 Volume 6, Number 1 (2014), pp. 35-40
© Research India Publications
Lead time Reduction Using Lean Manufacturing Principles
For Delivery Valve Production
Bharath R1, Dr G S Prakash2
1Student, M Tech, Department of Industrial Engineering Management
M S Ramaiah Institute of Technology, Bangalore, Karnataka
2Professor and Head of Department, Department of Industrial Engineering
Management, M S Ramaiah Institute of Technology, Bangalore, Karnataka
1email – ramkbharath@, 2email – prakash5636@
Abstract
Lead time is the time spent between the original customer order and
final delivery of the product. Project work is being carried out at XYZ
organization in Bangalore. Lean manufacturing is a production practice
that considers expenditure of resources for any goal other than creation
of value for the end customer to be wasteful and thus a target for
elimination. Lead time is calculated by adding value added time and
non-value added time. Delivery valve is a non-return valve between
the high pressure for the fuel injection system and pump plunger. On
observing the present system of delivery valve production the current
lead time was calculated and was found to be 14.60 days. The lean
tools that are applied in this project are First-In-First-Out (FIFO), a
method for organizing the component buffer where the oldest entry or
bottom of the stack is processed first which eliminates inventory which
in turn reduces the lead time and Value Stream Mapping (VSM) to
map the pre
您可能关注的文档
- K45 Aperam About(K45 Aperam).pdf
- July 2001 California Bar Examination Essay (2001年7月加州律师资格考试的文章).pdf
- Kabbalah for Beginners(卡巴拉初学者).pdf
- Kapasitet av groutede forbindelser (Kapasitet av groutede forbindelser ).pdf
- Junction box Welcome to leoch battery!VRLA (接线盒,欢迎来到leoch电池! VRLA).pdf
- KAYAKING Prepared. For Life.174;(皮划艇,准备。).pdf
- Kaydon Bearings Slewing ing earings XR Series(169;Kaydon轴承回转ing耳索XR系列).pdf
- Kaydon Bearings Slewing Ring Bearings (169;Kaydon轴承回转环轴承).pdf
- June 2017 Hang Seng Indexes(2017年6月,恒生指数).pdf
- K.DELIJI]ETAL ...(K。).pdf
最近下载
- 刑事审判参考2001年第7辑(总第18辑).pdf VIP
- 刑事审判参考2001年第4辑(总第15辑).pdf VIP
- GB/T 18998.5-2022工业用氯化聚氯乙烯(PVC-C)管道系统 第5部分:系统适用性.pdf
- 刑事审判参考2001年第8辑.总第19辑.pdf VIP
- 急诊危重症护理新进展题库答案-2025年华医网继续教育答案.docx VIP
- 《共圆中国梦》教学设计 统编版道德与法治九年级上册.pdf
- 新解读《DL_T 2765—2024输变电工程逻辑模型规范》最新解读.docx VIP
- 2025年锅炉水处理作业G3证理论考试笔试试题(400题)含答案.docx VIP
- 刑事审判参考2001年第9辑.总第20辑.pdf VIP
- 房地产开发重要节点及流程.pptx VIP
文档评论(0)