000
摘要:本装置主要用于600MW,1 MW火电机组发电机定子汽机房吊装作业,配
合汽机房原有行车,在对行车及轨道不额外加固的情况下,利用4组200t液压提升装
置,完成从吊物孔起升到定子基础的就位作业。介绍该装置的设计及现场使用情况。
关键词:发电机定子;设计;校核;应用
文献标识码:A
中图分类号:TM312.1
and of for stators
Designapplicationspecialliftingequipmentgenerator
YANG Qiang
Jian-ping,LV
ProvincialThermalConstructlon
(Hunan Power Company,Zhuzhou412000,Chins)
wa8usedfor of600MWor1000MW withturbinehallcrarle
Abstract:The lifting units.Together
equipment generator醯ators
andfour d200t work0f thestatorfromthehoistareatoitsmstaIlation
gvups hydraulicliftingequipment。thelifting position
additionalload011
WaSnⅢlhedwithout craneandrails.Thisamdeintroducesthe and011·site ofthe
design application
eqIIip吣It.
K留words:genena∞stator;design;verification;application
000
国内600MW,lMW火电机组的发电机定
1装置的设计及应用
子一般超过300t,是安装施工的重要设备,电建
施工单位将其列人重大吊装方案。以往的吊装方案 1.1装置的设计
是液压提升装置加专用吊装架,从吊物孔或A排 国内大部分600MW机组发电机定子最大重量
000
柱外或汽机房端头拖运至基础再就位;或对行车进 为320t,1 MW机组发电机定子最大重量为
行加强设计,利用4个小车共同抬吊。但以上方案 450 t
t。整套专用装置在设计计算时满足Q=450
施工劳动强度大、工期长,或行车加强设计成本
您可能关注的文档
- 发电厂ups并机运行隐患分析与处理.pdf
- 发电厂ups系统的设计探讨.pdf
- 发电厂vrla蓄电池运行维护分析 analysis of operation and maintenance of vrla battery in power plant.pdf
- 发电厂vrla蓄电池运行维护分析 operation and maintenance of vrla battery for power plant.pdf
- 发电厂备用电源自投成功率分析 analysis of success probability of bzt in power plant.pdf
- 发电厂保温外护工艺探讨 discussion on heat preservation and outside protection technics in power plant.pdf
- 发电厂变频设备的谐波分析 harmonics analysis on inverter device of power plant.pdf
- 发电厂标识系统综述和选择原则探讨 selection principle and summarize identification system for power plant.pdf
- 发电厂5吨36米装卸桥主要构件的疲劳寿命评估 the fatigue life assessment of the shipping bridge in the power plant.pdf
- 发电厂并网考核与辅助服务补偿细则评价指标体系 an evaluation system for two regulations on power plant operation assessment and ancillary service compensation.pdf
- 2025-2026学年天津市和平区高三(上)期末数学试卷(含解析).pdf
- 2025-2026学年云南省楚雄州高三(上)期末数学试卷(含答案).pdf
- 2025-2026学年甘肃省天水市张家川实验中学高三(上)期末数学试卷(含答案).docx
- 2025-2026学年福建省厦门市松柏中学高二(上)期末数学试卷(含答案).docx
- 2025-2026学年广西钦州市高一(上)期末物理试卷(含答案).docx
- 2025-2026学年河北省邯郸市临漳县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省石家庄二十三中七年级(上)期末历史试卷(含答案).docx
- 2025-2026学年海南省五指山市九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省唐山市玉田县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省邢台市市区九年级(上)期末化学试卷(含答案).docx
最近下载
- 保障农民工工资支付协调机制和工资预防机制.docx VIP
- (35页PPT)腾讯iOA零信任安全解决方案.pptx
- 供应链管理第章.ppt VIP
- 有机化学醇酚醚.ppt VIP
- 【真题】2025年湖北省公务员考试《申论》试题及答案解析(县乡卷).pdf VIP
- 《2025年人工智能在制造业应用》.docx VIP
- 2018年浙江省杭州市中考科学试卷含答案.docx VIP
- 东北地区自然地理概况课件市公开课一等奖省赛课微课金奖课件.pptx VIP
- Power Up3课后单元测试 - U7 - Unit Test.docx VIP
- EN755-2铝及铝合金挤压杆材,管材及型材 第2部分:机械性能.doc
原创力文档

文档评论(0)