网站大量收购独家精品文档,联系QQ:2885784924

CHAPTER2 INTRODUCTION TO MATERIALS (第2章介绍材料).pdf

CHAPTER2 INTRODUCTION TO MATERIALS (第2章介绍材料).pdf

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CHAPTER2 INTRODUCTION TO MATERIALS (第2章介绍材料)

CHAPTER-2 INTRODUCTION TO MATERIALS MANAGEMENT Materials constitute a major cost component for any Industry. The total cost of installed materials (or Value of Materials) may be 60% or more of the total cost (Stukhart 2007, Bernold and Treseler 1991), even though the factory cost may be a minor part of the total, probably less than 20-30%. This is because the manufactured item must be stored, transported, and restored before it is put in place or consumed at the site. The total cost of materials will include, in addition to the manufacturer selling cost, the cost of procurement (cost of placing processing and paying the material, physical distribution, the distributors cost, and the transportation of materials), and the site-handling costs (cost of receiving, storage, issuing, and disposal). The efficient procurement and handling of material represent a key role in the successful completion of the work. It is important for the contractor to consider that there may be significant difference in the date that the material was requested or date when the purchase order was made and the time at which the material will be delivered. These delays can occur if the contractor needs a large quantity of material that the supplier is not able to produce at that time or by any other factors beyond his control. The contractor should always consider procurement of materials is a potential cause for delay (Willis, 2008). 30 Poor planning and control of materials, lack of materials when needed, poor identification of materials, re-handling and inadequate storage cause losses in labor productivity and overall

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档